What Does a First Article Inspection (FAI) Report for Stamped Parts Include?

July 23, 2026

Stamping press on the production floor at Tan Phong An Industrial Company Limited (2), a DEWIN-audited Vietnamese factory

First Article Inspection report contents for stamped metal parts

A missing First Article Inspection 1 (FAI) report for stamped parts once cost one of our clients three weeks of rework. On our sourcing projects, that lesson shaped everything we now demand from suppliers.

A First Article Inspection (FAI) report for stamped parts includes part identification, material certifications, special process records, a ballooned drawing, and a characteristic-by-characteristic list showing every dimension, tolerance, measured result, and pass/fail status, plus any nonconformance and corrective action documentation.

That is the short answer. But the details matter, especially for stamped parts quality management 2. Let me walk you through what a complete FAI report looks like and how to use it.

How can I make sure my supplier's FAI report matches every dimension on my drawing?

A buyer once forwarded me an FAI report with only twelve dimensions listed. His drawing had thirty-one callouts. Our team in Vietnam caught the gap before production started.

Require a ballooned drawing where every dimension, note, and callout gets a numbered bubble, then cross-check each bubble number against the characteristic accountability sheet. If the count of balloons equals the count of recorded results, and each has a measured value, coverage is complete.

Ballooned drawing cross-checked against characteristic accountability sheet for full dimension coverage

The ballooned drawing is the backbone of any FAI report. Without it, you cannot verify coverage. Here is the process we follow on every stamped-part project before we release a supplier to production.

The balloon-to-report cross-check process

  1. Count every dimension, tolerance, note, and finish callout on the print. Include title-block notes. Include material specs.
  2. Confirm the supplier's ballooned drawing assigns a unique number to each one.
  3. Match each balloon number to a line in the characteristic sheet.
  4. Verify each line shows the requirement, the actual measured value, and a pass/fail status.
  5. Flag any balloon with a blank result or a vague entry like "OK" or "conforms" without a number.

That last point matters. A real measurement reads "12.48 mm" against a requirement of "12.50 ± 0.10 mm." An entry that just says "pass" tells you nothing about process margin. On stamped brackets and clips, we push suppliers to record actual values for hole positions, bend angles, flange heights, and flatness. Springback 3 makes bend angles drift, so a measured value near the tolerance edge is an early warning even when the part technically passes.

Also check the revision level. Stamping dies get modified. If the FAI references drawing revision B but your purchase order calls out revision C, the whole report is invalid. We have seen this mix-up more than once, and it is cheap to catch on paper and expensive to catch at your dock.

✔ An FAI requires 100% inspection of every drawing characteristic, not a sample of key dimensions True
First article inspection verifies the full engineering definition, so every dimension, tolerance, and note on the print must be ballooned, measured, and recorded.
✘ If the FAI sheet marks every dimension as “pass,” the report is complete and reliable False
A pass/fail entry without actual measured values hides how close the part sits to tolerance limits, which is exactly where stamping springback and die wear cause future failures.
Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

What key sections should I look for when reviewing a stamped parts FAI report?

There is a trade-off I weigh on every project: how strict to be on FAIR format versus content. Our quality engineers accept different templates, but never missing sections.

Look for three core sections: part number accountability (identity, revision, supplier, sign-offs), product accountability (material certs, special processes, functional tests), and characteristic accountability (each dimension with requirement, actual result, and status), plus an attached ballooned drawing and any nonconformance records.

Key FAI report sections including part, product, and characteristic accountability details

Most FAI reports for stamped parts follow the AS9102-style three-form structure, even outside aerospace. Different customers use different templates, but the required content stays the same. Here is how the sections break down and why each one matters for stampings.

Section What it contains Why it matters for stamped parts
Form 1: Part Number Accountability Part number, name, drawing revision, PO number, supplier ID, inspector signature, date Confirms the correct part and die revision were inspected, preventing mix-ups across variants
Form 2: Product Accountability Raw material spec and certs, special processes (plating, heat treat), functional tests Verifies the steel grade, thickness, and post-stamp operations match the design
Form 3: Characteristic Accountability Balloon number, requirement, tolerance, measured result, pass/fail Proves the formed geometry actually matches the print

Stamped-part specifics inside Form 2

For stampings, product accountability deserves extra attention. The material cert 4 should show the exact grade and thickness called out on the drawing, tied to a heat lot number. If your bracket requires zinc plating, passivation, or heat treatment, each process needs its own record referencing the applicable spec. Grain direction notes matter too. A blank oriented against the rolling direction can crack at tight bends, so a good supplier documents blank orientation when the drawing calls it out.

The nonconformance section

Do not skip this part. If any dimension failed, the report should reference a nonconformance number and a disposition: rework, use-as-is with your approval, or die correction. A report with a hidden failure is worse than a report with a documented one. On our projects, an honest deviation with a corrective action plan builds trust. A "clean" report that later fails incoming inspection destroys it.

Why do I need FAI reports before approving mass production of stamped parts?

Early in my sourcing career, a client skipped the FAI on a "simple" mounting clip to save a week. The first shipment of 20,000 pieces had a hole location off by 0.4 mm. Every piece failed assembly.

FAI reports catch die setup errors, wrong material, springback deviation, and missing processes on the very first piece, before tooling and volume lock those defects into thousands of parts. Approving production without one shifts all quality risk from the supplier's press floor to your receiving dock.

FAI reports catching die setup errors before mass production of stamped parts

Stamped parts look simple. That appearance is deceptive. A progressive die 5 may run ten stations, and each one can introduce error. The FAI is the only formal gate that verifies the entire stamping process chain — material, die, press setup, and post-processing — before you commit to volume.

What the FAI is designed to catch

Risk How it appears in stampings Where the FAI catches it
Material mismatch Wrong grade or thickness from a substitute coil Form 2 material cert check
Springback error Bend angles open beyond tolerance after forming Form 3 measured bend angles
Hole position drift Punch station misalignment in the progressive die Form 3 datum-based measurements
Missing special process Plating or heat treat skipped or under-spec Form 2 process records
Wrong revision Die built to an outdated print Form 1 revision verification

When a new FAI is required

An FAI is not always a one-time event. You should require a new or delta FAI when any of these trigger events occur: an engineering change to the drawing, a die modification or repair, a change of supplier or manufacturing location, a material source change, or a long production gap — commonly anything beyond one to two years. In our supply chain 6 work between Vietnam and the US, relocations and tooling transfers are the most common triggers buyers forget about. The die that produced perfect parts in one plant can behave differently on another press with different tonnage and shut height. A fresh first-piece verification after any such change costs a few days. Skipping it can cost a container of scrap.

✔ A new FAI is required after tooling changes, supplier relocation, or engineering revisions, not just at first production True
Any change to the die, process, location, or drawing can shift dimensional results, so the first piece after the change must be re-verified against the full print.
✘ Simple stamped parts like brackets and clips are too basic to need a formal FAI False
Springback, die wear, and progressive-die station errors affect simple geometries just as much as complex ones, and volume production multiplies any first-piece defect by thousands.

How can I use FAI reports to reduce quality risks when sourcing from Asian suppliers?

A purchasing manager in the US once told me his biggest fear was not price — it was discovering nonconforming stampings after the ocean freight arrived. Our team hears that concern on almost every new project.

Use the FAI report as a contractual production gate: require it before releasing mass production, have a third party or your sourcing partner witness or re-verify measurements locally, and tie payment milestones to FAI approval. This moves defect detection from your dock back to the supplier's factory.

Quality engineer verifying stamped parts FAI report at Asian supplier factory before shipment

Distance amplifies quality risk. When your supplier is in Vietnam, Taiwan, or India and you are in Ohio, you cannot walk to the press line. The FAI report becomes your remote eyes — but only if you manage it deliberately. Here is the approach we apply on custom stamped-part projects for US clients.

Make the FAI a hard gate, not a courtesy

Write the FAIR requirement into your purchase order. State that mass production cannot start until you approve the report in writing. Suppliers respect what the PO enforces. A verbal request gets deprioritized when the press schedule is tight.

Verify locally before parts ship

A report can be complete on paper and still wrong in practice. Our engineers in Vietnam and China physically re-measure critical characteristics on the first articles — hole positions, bend angles, thickness after forming — with calibrated tools. Local verification catches transcription errors and, occasionally, reports written before the parts were actually measured. If you do not have people on the ground, use a sourcing partner or third-party inspector 7 who does.

Layer the FAI into a wider quality system

Stage Control What it protects
Before order Supplier audit Confirms real stamping and measurement capability
First production FAI report and local re-verification Proves the first piece matches the print
Ongoing production In-process checks and process control plans Catches die wear and drift over time
Before shipment Final inspection against the approved FAI Confirms production parts still match the baseline

The approved FAI also becomes your reference baseline. Every later inspection, and every dispute, gets settled against it. When a supplier knows the first article defines the standard, right-first-time behavior follows. That single document, handled well, does more to protect your stamped-part quality than any penalty clause ever will.

Conclusion

An FAI report for stamped parts is your evidence package linking print, material, process, and measured results. Demand it, verify it, and gate production on it — before risk crosses the ocean.

Frequently Asked Questions

How can I make sure my supplier's FAI report matches every dimension on my drawing?

A buyer once forwarded me an FAI report with only twelve dimensions listed. His drawing had thirty-one callouts. Our team in Vietnam caught the gap before production started.

What key sections should I look for when reviewing a stamped parts FAI report?

There is a trade-off I weigh on every project: how strict to be on FAIR format versus content. Our quality engineers accept different templates, but never missing sections.

Why do I need FAI reports before approving mass production of stamped parts?

Early in my sourcing career, a client skipped the FAI on a "simple" mounting clip to save a week. The first shipment of 20,000 pieces had a hole location off by 0.4 mm. Every piece failed assembly.

Footnotes


1. Links to the industry standard defining formal first article inspection requirements. ↩︎


2. ISO 9001 quality management underpins the inspection and corrective action processes described. ↩︎


3. Defines the metal forming phenomenon repeatedly cited as a stamping quality risk. ↩︎


4. References ISO documentation standards for material certification traceability in manufacturing. ↩︎


5. Background concept for the multi-station stamping tooling discussed throughout article. ↩︎


6. ISO governs quality management standards underlying FAI and supplier certification practices. ↩︎


7. ISO provides standards referenced by third-party inspection and quality verification services. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.