Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

What U.S. Tariffs and Duties Apply When Sourcing Sheet Metal Fabrication From Vietnam?

July 7, 2026

Assembly line at Just Specical Material, a DEWIN-audited Vietnamese factory

Overview of U.S. tariffs and duties for sheet metal fabrication sourced from Vietnam

Every week, our team in Vietnam fields calls from U.S. buyers blindsided by duty bills that doubled their landed cost on sheet metal fabrication 1 orders.

U.S. tariffs on sheet metal fabrication from Vietnam currently include a 20% reciprocal tariff on the finished goods, plus a 50% Section 232 tariff on articles made entirely of steel or aluminum, creating a combined duty burden that can reach 70% or more of the customs value.

The tariff landscape is layered and volatile. Below, I break down every duty, fee, and compliance risk you need to plan for before placing your next order.

How much can I save on Section 301 duties by moving my sheet metal fabrication from China to Vietnam?

A client we work with in the Midwest moved three bracket programs from China to our Vietnam facility last year, and the first question was always the same: "How much do I actually save after all tariffs?"

Moving sheet metal fabrication from China to Vietnam eliminates the 145% Section 301 tariff on Chinese goods, but you still face a 20% reciprocal tariff plus a 50% Section 232 metal tariff in Vietnam — a significant reduction, though far from duty-free.

Comparison of Section 301 and 232 duties for sheet metal from China and Vietnam

The China Tariff Baseline

To understand the savings, you first need the China benchmark. Chinese sheet metal fabrication currently faces a punishing stack of duties. Section 301 tariffs 2 alone sit at 145% for most steel and aluminum products. On top of that, Section 232 tariff 3s of 50% apply to articles made entirely of metal. And many Chinese steel categories carry anti-dumping duties 4 that can exceed 130%. The total landed cost multiplier from China can be staggering.

The Vietnam Tariff Stack

Vietnam's duty structure is simpler but still substantial. The 20% reciprocal tariff was finalized in August 2025 after negotiations reduced the initial proposal of 46%. The Section 232 tariff of 50% applies to articles made entirely or almost entirely of steel or aluminum. Sheet metal brackets, enclosures, and chassis fall squarely into this category.

Here is a side-by-side comparison using a hypothetical $10,000 shipment of steel sheet metal fabrication:

Cost Component China Origin Vietnam Origin
Product Value (CIF) $10,000 $10,000
Section 301 Tariff $14,500 (145%) $0
Reciprocal Tariff N/A $2,000 (20%)
Section 232 Tariff (50%) $5,000 $5,000
Anti-Dumping Duty (est.) $13,000+ (130%+) $0 (if no AD order)
Total Duties $32,500+ $7,000
Landed Duty Rate 325%+ 70%

The math is clear. Even at 70%, Vietnam is dramatically cheaper than China for metal-intensive parts. But 70% is still a heavy burden. Our supply chain strategy for clients involves mapping every HTS code to confirm which tariff layers actually apply, because a single digit in the classification can shift the rate.

When the Savings Narrow

The savings gap shrinks if your Chinese supplier already benefits from an exclusion or if your Vietnam supplier uses Chinese-origin steel. If U.S. Customs determines the raw material was merely cut and bent in Vietnam without substantial transformation 5, transshipment penalties of 40% can be added. I have seen this happen to importers who did not verify their supplier's steel sourcing. The lesson: savings are real, but only if your import compliance is airtight.

✔ Moving sheet metal sourcing from China to Vietnam can reduce total duties from over 300% to approximately 70%. True
China-origin steel fabrication faces stacked Section 301, Section 232, and AD/CVD duties that far exceed Vietnam’s reciprocal and Section 232 tariff combination.
✘ Sourcing from Vietnam means you pay zero tariffs on sheet metal because Vietnam has a free trade agreement with the U.S. False
The U.S. does not have a free trade agreement with Vietnam. Vietnamese sheet metal fabrication is subject to both reciprocal tariffs and Section 232 metal tariffs.
Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

Which specific anti-dumping or countervailing duties might apply to my custom metal imports from Vietnam?

During a recent supplier audit at a fabrication shop outside Ho Chi Minh City, I asked the plant manager which steel grades they stock. His answer — cold-rolled carbon steel from a domestic mill — immediately mattered for one reason: anti-dumping duties.

Vietnam currently faces active anti-dumping and countervailing duty orders on specific steel products including cold-rolled steel, corrosion-resistant steel, and certain carbon steel, with combined AD/CVD rates that can exceed 130% depending on the product classification and exporter.

Anti-dumping and countervailing duty rates for Vietnamese steel products and custom metal imports

Understanding AD/CVD Orders on Vietnamese Steel

Anti-dumping duties target foreign goods sold in the U.S. at below fair-market value. Countervailing duties 6 offset foreign government subsidies. Both are product-specific and exporter-specific. They apply in addition to all other tariffs.

The U.S. Department of Commerce 7 maintains active AD/CVD orders on several steel product categories from Vietnam. Here are the key ones relevant to sheet metal fabrication:

Steel Product Category AD Duty Rate (Vietnam) CVD Duty Rate (Vietnam) Combined Potential
Cold-Rolled Steel 8 Flat Products Up to 199.76% Up to 39.05% Over 230%
Corrosion-Resistant Steel Products Up to 199.43% Up to 39.05% Over 230%
Certain Carbon & Alloy Steel Wire Rod Varies by exporter Varies Significant
Steel Wire Garment Hangers 220.68%+ N/A Over 220%

These rates apply to the raw material or semi-finished product, not necessarily to a custom fabricated part. This distinction is critical.

Do AD/CVD Duties Apply to Custom Fabricated Parts?

Here is where it gets nuanced. If you import a flat sheet of cold-rolled steel from Vietnam, the AD/CVD order applies directly. But if you import a fully fabricated bracket — laser-cut, bent, welded, and powder-coated — the product may fall under a different HTS code that is not covered by the AD/CVD order.

The key question is how CBP enforcement classifies your product. A simple sheared blank may still be considered a "flat product." A complex welded assembly with mounting holes and a finished surface is more likely classified as a fabricated article. Our team works with a licensed customs brokerage partner to pre-classify every part before shipment. We submit HTS codes for review and keep binding ruling requests on file for high-volume programs.

How to Check If Your Product Is Subject to AD/CVD

  1. Identify the exact HTS code for your finished fabricated part.
  2. Search the U.S. International Trade Commission's AD/CVD order database.
  3. Compare your product description against the scope language of any active order.
  4. If the scope is ambiguous, request a scope ruling from the Department of Commerce.
  5. Engage a customs broker to file a pre-importation classification review.

The risk of getting this wrong is severe. If CBP determines your fabricated part falls within an AD/CVD scope, you owe the duties retroactively — plus interest and potential penalties. I always tell our clients: spend the money on classification upfront. It is far cheaper than a surprise bill six months after entry.

✔ Anti-dumping duties on Vietnamese cold-rolled steel can exceed 199%, making raw material classification critical for importers. True
The U.S. Department of Commerce has set AD rates as high as 199.76% on cold-rolled steel flat products from Vietnam for certain exporters.
✘ If my part is fabricated in Vietnam, anti-dumping duties never apply because it is no longer raw steel. False
CBP evaluates whether the fabricated product still falls within the scope of an AD/CVD order based on the product description and HTS classification, not simply whether it has been processed.

How do I ensure my Vietnamese supplier meets the "Country of Origin" requirements to avoid U.S. customs penalties?

Last quarter, a prospective client came to us after their previous Vietnamese supplier's shipment was flagged by CBP at the port of Long Beach. The reason: the steel was Chinese, and the fabrication was minimal. The penalty was a 40% transshipment surcharge on top of all existing duties.

To meet U.S. country of origin rules for Vietnamese sheet metal fabrication, the product must undergo "substantial transformation" in Vietnam — meaning the manufacturing process changes the name, character, or use of the imported raw material into a new and different article, not just minor cutting or bending.

Substantial transformation requirements for Vietnamese country of origin in sheet metal fabrication

What Is Substantial Transformation?

U.S. Customs applies a legal test called "substantial transformation." The raw material must be fundamentally changed in Vietnam. For sheet metal, this means the fabrication must go well beyond slitting a coil or shearing a blank. The product that enters the U.S. must be a different article from the steel that entered Vietnam.

Here is a practical guide to what typically qualifies and what does not:

Process Performed in Vietnam Likely Qualifies as Substantial Transformation? Notes
Slitting steel coil into strips No Minimal processing; same product form
Shearing sheet to size No Does not change character or use
Laser cutting + multi-step bending Possibly Depends on complexity
Laser cut + bend + weld + finish Yes Creates a new article with distinct use
Full assembly with hardware and coating Yes Clearly a different product
Stamping from flat sheet into formed part Yes (usually) Changes name, character, and use

The Transshipment Risk

CBP is aggressive on transshipment enforcement, especially for steel and aluminum from Vietnam. The agency knows that some suppliers import Chinese steel, perform token processing, and re-export it with a Vietnamese Certificate of Origin. The penalty for this is a 40% transshipment tariff on top of all other duties. In some cases, CBP seizes the goods entirely.

Our Vietnam office conducts pre-shipment audits that include verifying the steel mill certificates. We confirm that the raw material was either produced in Vietnam or, if imported, that the fabrication performed in Vietnam is substantial enough to confer Vietnamese origin. We photograph each stage of production and maintain full traceability files.

Documentation You Need

To protect yourself, require the following from your supplier:

  • Mill test certificates showing the country where the steel or aluminum was melted and poured.
  • Certificate of Origin issued by the Vietnam Chamber of Commerce and Industry (VCCI).
  • Production process records with photographs and timestamps.
  • Bill of materials showing the percentage of Vietnamese-origin content versus imported content.
  • Customs broker review of the HTS code and origin determination before shipment.

If your supplier cannot or will not provide these documents, that is a red flag. In our experience, legitimate fabricators are happy to share this data because it protects them too. The suppliers who resist transparency are often the ones routing Chinese steel through Vietnam with minimal work.

The 15% Metal Content Threshold

One lesser-known rule is the metal content threshold for Section 232. If your finished product contains 15% or less metal by value, it may not be subject to the 50% Section 232 tariff at all. This is relevant if you are importing a sub-assembly that includes significant non-metal components such as plastic housings, rubber gaskets, or electronic modules. For pure sheet metal fabrication — brackets, enclosures, chassis — the metal content is nearly 100%, so the 50% rate applies. But for mixed assemblies, it is worth calculating.

What other import fees and processing charges should I expect when calculating my total landed cost from Vietnam?

One trade-off we constantly evaluate for clients is whether a lower unit price from a Vietnamese supplier actually results in a lower total landed cost once every fee is included. The answer depends on math most buyers do not do until the invoice arrives.

Beyond tariffs and duties, your total landed cost from Vietnam includes ocean or air freight, marine insurance, customs brokerage fees, Merchandise Processing Fee (0.3464% of value), Harbor Maintenance Fee (0.125% of value), container drayage, warehousing, and potential exam or inspection fees charged by CBP.

Breakdown of total landed cost including freight, insurance, and customs processing fees from Vietnam

Breaking Down the Full Landed Cost

Most buyers focus on the tariff percentage and forget the dozen other line items that add up. Here is a realistic landed cost calculation for a $10,000 CIF shipment of steel sheet metal fabrication from Vietnam:

Cost Item Amount Notes
Product Value (CIF) $10,000 Includes freight and insurance to U.S. port
Reciprocal Tariff (20%) $2,000 Based on customs value
Section 232 Tariff (50%) $5,000 For articles made entirely of steel/aluminum
Merchandise Processing Fee 9 $34.64 0.3464% of value, min $31.67, max $614.35
Harbor Maintenance Fee $12.50 0.125% of value
Customs Broker Fee $150–$350 Varies by broker and complexity
Container Drayage $500–$1,200 Port to warehouse, varies by distance
Warehouse Handling $100–$300 Unloading and storage
CBP Exam Fee (if selected) $0–$1,000+ Random or targeted; x-ray vs. full devanning
Bond Premium $50–$100 Single entry bond; continuous bond is annual
Total Estimated Landed Cost $17,847–$19,997 Effective rate: 78%–100% above product value

Fees People Miss

The Merchandise Processing Fee and Harbor Maintenance Fee are small but mandatory on every entry. The customs broker fee is unavoidable — you need a licensed broker to file entry with CBP. What catches people off guard are the exam fees. If CBP selects your container for inspection, you pay for the trucking to the exam site, the exam itself, and any delays. This can add $500 to $2,000 per container.

Also factor in the cost of a customs bond. If you import infrequently, you buy a single-entry bond for each shipment. If you import regularly, a continuous bond — typically set at 10% of your annual duty payments — is more cost-effective. Given the high duty rates on steel fabrication, your bond amount can be substantial.

Freight and Lead Time Considerations

Ocean freight from Vietnam to the U.S. West Coast typically runs 18–25 days. To the East Coast via the Suez Canal, expect 30–40 days. Air freight cuts transit to 3–5 days but costs 5–10 times more per kilogram. For heavy steel parts, ocean is almost always the right choice. But you must plan for longer lead times and carry more safety stock.

Our logistics team coordinates door-to-door shipments so the client receives a single landed cost quote before production begins. We include every fee in the calculation — no surprises. This is especially important for manufacturing outsourcing Vietnam programs where the buyer is comparing total cost against domestic fabrication or other offshore sources.

Do Free Trade Agreements Help?

The U.S. does not have a free trade agreement with Vietnam. There is no preferential tariff rate. Some buyers ask about the Generalized System of Preferences (GSP), but Vietnam's GSP eligibility for steel products is either nonexistent or suspended under current trade policy. The bottom line: there is no shortcut on duties for Vietnamese sheet metal. Your landed cost calculation must assume full tariff exposure.

✔ The Merchandise Processing Fee and Harbor Maintenance Fee are mandatory U.S. import charges that apply in addition to all tariffs and duties. True
These fees are assessed by CBP on every formal entry regardless of the product or country of origin, and they cannot be waived.
✘ A customs broker is optional when importing sheet metal fabrication because you can self-file with CBP. False
While self-filing is technically possible, the complexity of Section 232 tariffs, AD/CVD exposure, and HTS classification for sheet metal makes a licensed customs broker essential to avoid costly misclassification and penalties.

Conclusion

Sourcing sheet metal fabrication from Vietnam saves substantially versus China, but the 70% combined duty burden demands careful HTS classification, origin verification, and full landed cost analysis — work our team handles end-to-end.

Frequently Asked Questions

Do AD/CVD Duties Apply to Custom Fabricated Parts?

Here is where it gets nuanced. If you import a flat sheet of cold-rolled steel from Vietnam, the AD/CVD order applies directly. But if you import a fully fabricated bracket — laser-cut, bent, welded, and powder-coated — the product may fall under a different HTS code that is not covered by the AD/CVD order.

How to Check If Your Product Is Subject to AD/CVD Identify the exact HTS code for your finished fabricated part. Search the U.S. International Trade Commission's AD/CVD order database. Compare your product description against the scope language of any active order. If the scope is ambiguous, request a scope ruling from the Department of Commerce. Engage a customs broker to file a pre-importation classification review. The risk of getting this wrong is severe. If CBP determines your fabricated part falls within an AD/CVD scope, you owe the duties retroactively — plus interest and potential penalties. I always tell our clients: spend the money on classification upfront. It is far cheaper than a surprise bill six months after entry. ✔ Anti-dumping duties on Vietnamese cold-rolled steel can exceed 199%, making raw material classification critical for importers. True The U.S. Department of Commerce has set AD rates as high as 199.76% on cold-rolled steel flat products from Vietnam for certain exporters. ✘ If my part is fabricated in Vietnam, anti-dumping duties never apply because it is no longer raw steel. False CBP evaluates whether the fabricated product still falls within the scope of an AD/CVD order based on the product description and HTS classification, not simply whether it has been processed. How do I ensure my Vietnamese supplier meets the "Country of Origin" requirements to avoid U.S. customs penalties? Last quarter, a prospective client came to us after their previous Vietnamese supplier's shipment was flagged by CBP at the port of Long Beach. The reason: the steel was Chinese, and the fabrication was minimal. The penalty was a 40% transshipment surcharge on top of all existing duties. To meet U.S. country of origin rules for Vietnamese sheet metal fabrication, the product must undergo "substantial transformation" in Vietnam — meaning the manufacturing process changes the name, character, or use of the imported raw material into a new and different article, not just minor cutting or bending. What Is Substantial Transformation?

U.S. Customs applies a legal test called "substantial transformation." The raw material must be fundamentally changed in Vietnam. For sheet metal, this means the fabrication must go well beyond slitting a coil or shearing a blank. The product that enters the U.S. must be a different article from the steel that entered Vietnam.

Do Free Trade Agreements Help?

The U.S. does not have a free trade agreement with Vietnam. There is no preferential tariff rate. Some buyers ask about the Generalized System of Preferences (GSP), but Vietnam's GSP eligibility for steel products is either nonexistent or suspended under current trade policy. The bottom line: there is no shortcut on duties for Vietnamese sheet metal. Your landed cost calculation must assume full tariff exposure.

Footnotes


1. Provides a comprehensive overview of sheet metal fabrication from an industry source. ↩︎


2. Official USTR page providing an overview of Section 301 investigations. ↩︎


3. Explains the U.S. Section 232 tariffs on steel and aluminum imports. ↩︎


4. Defines anti-dumping duties and their purpose in U.S. trade law. ↩︎


5. Defines the legal principle of substantial transformation for country of origin rules. ↩︎


6. Explains countervailing duties and how they address foreign government subsidies. ↩︎


7. Official website for the U.S. Department of Commerce, a key trade enforcement agency. ↩︎


8. Describes the properties and common applications of cold-rolled steel. ↩︎


9. Explains the Merchandise Processing Fee charged by U.S. Customs and Border Protection. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry