What US Import Regulations and Tariffs Apply When Sourcing Stamping Parts From Vietnam?

July 9, 2026

Cutting and drilling equipment at Az Construction And Interior Design, a DEWIN-audited Vietnamese factory

Overview of US import regulations and tariffs for sourcing metal stamping parts from Vietnam

When our Vietnam office first handled a stamping parts shipment to the US, we hit an unexpected tariff wall that nearly wiped out the cost savings we had promised our client. US import regulations 1

US import regulations for stamping parts from Vietnam include standard MFN duties based on HS codes, a Section 232 tariff of up to 50% on steel or aluminum components, a 10% Section 122 global tariff, strict country-of-origin marking rules, and mandatory documentation including a Certificate of Origin and Entry Summary Declaration.

The tariff landscape for metal stamping parts sourced from Vietnam is layered and shifting. Let me walk you through each layer so you can calculate your true landed cost before committing to a purchase order.

How much can I save on Section 301 tariffs by moving my stamping part production from China to Vietnam?

One of the most common questions I hear from US purchasing managers is whether relocating stamping production from China to Vietnam will cut their tariff burden significantly.

Moving stamping parts production from China to Vietnam eliminates Section 301 tariffs of up to 25% on Chinese goods. However, steel or aluminum stampings from Vietnam still face Section 232 national-security tariffs, so the net savings depend entirely on material composition and the applicable HS codes.

Saving on Section 301 tariffs by moving metal stamping production from China to Vietnam

The Section 301 Savings Are Real — But Not Universal

Section 301 tariffs 2 were designed to target Chinese goods specifically. They add 7.5% to 25% on top of standard duties for a wide range of Chinese imports, including metal stamping parts. When you move production to Vietnam, those Section 301 charges disappear entirely. For a buyer importing $500,000 worth of stampings annually, that can mean $50,000 to $125,000 in direct savings.

But here is the catch. If your stamping parts are made of steel or aluminum — and most industrial brackets, clips, and mounting hardware are — Section 232 tariffs 3 still apply. These tariffs were enacted for national security reasons and hit steel and aluminum products regardless of the country of origin. The current Section 232 rate stands at up to 50% on steel and aluminum articles. For a deeper look at how these Section 232 steel tariffs apply when sourcing sheet metal fabrication from Vietnam, we have a dedicated breakdown.

Comparing the Total Tariff Burden

Tariff Layer China Origin Vietnam Origin
Standard MFN Duty (varies by HTS code) 2%–6% typical 2%–6% typical
Section 301 (China-specific) 7.5%–25% 0%
Section 232 (Steel/Aluminum) Up to 50% Up to 50%
Section 122 Global Tariff 10% 10%
Anti-Dumping / Countervailing Duties Case-specific Rarely applicable

The table makes it clear: the Section 301 elimination is a genuine benefit. But if your parts are steel or aluminum, Section 232 duties remain the dominant cost factor regardless of where you source.

When Vietnam Sourcing Makes the Most Financial Sense

The biggest savings come when your stamping parts are made from non-steel, non-aluminum materials. Copper alloy stampings, brass components, and specialized alloy brackets avoid Section 232 entirely. In those cases, moving from China to Vietnam can reduce your total tariff burden by 15% to 25% of the goods' declared value.

Our team in Vietnam works with several stamping facilities that handle copper and brass precision parts. For those projects, the supply chain diversification to Vietnam delivers both tariff savings and reduced geopolitical risk. But I always tell clients: run the landed cost calculation before you celebrate. Factor in the 10% Section 122 global tariff, freight differentials, and any quality assurance costs.

One critical warning: US Customs and Border Protection 4 is aggressively policing transshipment risks. If Chinese-made parts are merely re-labeled or minimally processed in Vietnam, a 40% transshipment penalty can apply. The parts must undergo a genuine "substantial transformation" in Vietnam to qualify for Vietnamese origin. We conduct supplier audits specifically to verify that the stamping, forming, and finishing operations happen in-country.

✔ Section 301 tariffs of up to 25% apply only to goods of Chinese origin and are eliminated by sourcing from Vietnam True
Section 301 tariffs were enacted specifically to address Chinese trade practices. Goods genuinely manufactured in Vietnam are not subject to these tariffs.
✘ Moving production to Vietnam eliminates all additional tariffs on steel stamping parts False
Section 232 tariffs on steel and aluminum apply regardless of the exporting country. Vietnam-origin steel stampings still face up to 50% in Section 232 duties.
Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

What specific HTS codes and import duties will apply to my custom metal stampings from Vietnam?

Getting the HS codes 5 wrong on a single shipment once cost one of our clients a three-week customs hold and an unexpected $8,000 penalty — a lesson none of us have forgotten.

Custom metal stampings from Vietnam are classified under 10-digit Harmonized Tariff Schedule codes, typically within Chapter 73 for steel articles, Chapter 74 for copper, or Chapter 84 for machinery parts. Standard MFN duty rates range from 0% to 6%, but the specific rate depends on the part's material, function, and end-use application.

HTS codes and MFN duty rates for custom metal stampings imported from Vietnam

Why the 10-Digit Code Matters

The international Harmonized System uses 6-digit codes. The US extends these to 10 digits under the Harmonized Tariff Schedule 6 of the United States (HTSUS). Those extra four digits determine your exact duty rate. Two stamping parts that look identical can carry different duty rates if one is classified as a "part of machinery" and the other as a "metal article not elsewhere specified." For a broader overview of how US import tariffs apply when sourcing sheet metal fabrication from Vietnam, see our companion guide.

Common HTS Chapters for Stamping Parts

HTS Chapter Description Typical MFN Duty Rate Section 232 Applicable?
Chapter 73 (e.g., 7326.90) Articles of iron or steel, n.e.s. 2.9%–3.4% Yes — up to 50%
Chapter 74 (e.g., 7419.99) Articles of copper 0%–3% No
Chapter 76 (e.g., 7616.99) Articles of aluminum 2.5%–5% Yes — up to 50%
Chapter 83 (e.g., 8302.49) Base metal mountings, fittings 3.4%–5.7% Depends on material
Chapter 84 (e.g., 8409.99) Parts of machinery 0%–2.5% Depends on material

How We Help Clients Classify Correctly

At our Vietnam and Singapore offices, we review engineering drawings alongside the USITC database before we ship a single container. Here is our process:

  1. Identify the material. Steel, aluminum, copper, or alloy? This determines the chapter.
  2. Determine the function. Is the part a standalone article, or does it serve as a component of a specific machine? Machine parts often qualify for lower duty rates under Chapter 84.
  3. Check the form. A flat stamped washer, a bent bracket, and a deep-drawn enclosure may fall under different subheadings even if they are all steel.
  4. Verify with a customs broker. We always recommend our US clients engage a licensed customs broker to confirm the 10-digit code. Misdeclaring HS codes can trigger fines, delays, or even confiscation by US Customs and Border Protection.

The metal stamping industry in Vietnam has grown rapidly, and so has the complexity of tariff classification. A precision-cut mounting bracket with a circular hole and an elongated slot — like the type we produce for automotive applications — could be classified under 7326.90 (articles of iron or steel) or 8708.99 (motor vehicle parts) depending on its documented end-use. The duty difference can be 1% versus 3.4%, and the Section 232 treatment may differ as well.

I strongly advise against guessing. Use the official USITC database at hts.usitc.gov. Request a binding ruling from US Customs if you are unsure. The small upfront effort saves you from costly surprises at the port.

✔ The US uses 10-digit HTS codes for precise tariff determination, not the international 6-digit HS codes True
The Harmonized Tariff Schedule of the United States extends the international 6-digit system to 10 digits, with the additional digits specifying exact duty rates and statistical categories.
✘ All metal stamping parts fall under a single HTS code regardless of material or end-use False
Stamping parts are classified across multiple chapters (73, 74, 76, 83, 84) based on material composition, form, and functional application. Using the wrong code can result in overpayment, underpayment, fines, or seizure.

Which compliance documents must I prepare to ensure my Vietnamese parts clear US Customs without delays?

A few months ago, one of our shipments was flagged at Long Beach because the packing list did not itemize part weights by line item — a detail that seemed minor until it caused a five-day hold.

To clear US Customs without delays, you need a commercial invoice with accurate values, a detailed packing list, a bill of lading or air waybill, a valid Certificate of Origin confirming Vietnamese manufacture, correct HS codes on all declarations, and proper "Made in Vietnam" country-of-origin marking on every part or package.

Essential compliance documents and Certificate of Origin for clearing US Customs with Vietnamese parts

The Core Document Checklist

Every stamping parts shipment from Vietnam to the US requires a specific set of import documentation. Missing or inaccurate paperwork is the number one cause of customs delays I see in our business. For detailed guidance on US customs clearance requirements when sourcing from Vietnam, we cover the full process in a separate article.

Document Purpose Who Prepares It
Commercial Invoice Declares value, quantity, material, and terms of sale Exporter (your supplier or agent)
Packing List Itemizes contents by box, weight, and dimensions Exporter
Bill of Lading (B/L) or Air Waybill Shipping contract and receipt of goods Freight carrier
Certificate of Origin 7 (COO) Proves goods were manufactured in Vietnam Vietnamese Chamber of Commerce or exporter
Entry Summary (CBP Form 7501) Official US customs declaration US importer or customs broker
Arrival Notice Notifies consignee of vessel arrival Carrier or freight forwarder
ISF (10+2 Filing) Importer Security Filing, required 24 hours before vessel loading Importer or customs broker

Country-of-Origin Marking

US regulations under 19 CFR Part 134 8 require every imported article to be marked with its country of origin in a conspicuous, legible, and permanent manner. For stamping parts, this typically means "Made in Vietnam" must appear on the part itself (if feasible) or on the immediate container.

I have seen shipments delayed because the marking was on an inner bag that customs officers could not see without opening the carton. Our quality assurance team in Vietnam now checks origin marking at the final inspection stage, before the container is sealed. This small step has eliminated marking-related holds entirely.

The Certificate of Origin in Detail

The Certificate of Origin is perhaps the most scrutinized document for Vietnam-sourced goods right now. US Customs and Border Protection uses it to verify that the parts genuinely originated in Vietnam and were not transshipped from China or another country with higher tariff obligations.

A valid COO for stamping parts should include:

  • Full legal name and address of the Vietnamese manufacturer
  • Description of the goods matching the commercial invoice
  • HS code classification
  • Statement confirming substantial transformation occurred in Vietnam
  • Signature and seal from the issuing authority

Our Vietnam team coordinates directly with the local Chamber of Commerce to ensure every COO is accurate and issued before the shipment date. We also maintain records of the manufacturer's business registration certificate and import/export business code, which Vietnamese customs requires on the export side.

Safety, Testing, and End-Use Requirements

Depending on what industry your stamping parts serve, additional certifications may be required. Automotive brackets may need PPAP documentation. Electrical enclosure stampings may require UL or CSA testing. Medical device components face FDA import requirements.

We build these requirements into the project timeline from day one. Our co-development process includes PPAP submissions — control plans, dimensional reports, and material certifications — so that the documentation is ready well before the first production shipment.

Filing the Entry Summary

The Entry Summary Declaration 9 (CBP Form 7501) must be filed within 15 calendar days of the goods' arrival at the US port. Many importers delegate this to their customs broker, and I strongly recommend doing so. The form requires the correct 10-digit HTS code, declared value, duty rate, and any applicable Section 232 or Section 122 tariff indicators.

Late or inaccurate filings trigger penalties. Repeated errors can lead to increased inspection rates on all your future shipments. Work with a customs broker who has specific experience with metal parts from Vietnam.

How can I leverage open account payment terms to manage the cash flow impact of my import duties and shipping costs?

Here is a trade-off most purchasing managers wrestle with: you have just calculated that your landed cost includes 50% in Section 232 duties on top of the part price, and now you need to pay those duties at the port before you can sell a single piece.

Open account payment terms of 60–90 days from your Vietnam supplier allow you to defer the purchase cost of stamping parts, freeing up cash to cover import duties, freight, and customs broker fees at the time of arrival. This effectively bridges the gap between duty payment and revenue collection from your end customers.

Managing cash flow for import duties using open account payment terms with Vietnam suppliers

The Cash Flow Challenge of Importing

When you import stamping parts, cash goes out in waves. First, you may pay a deposit to the supplier. Then freight charges come due. Then import duties and customs broker fees hit when the goods arrive. Finally, you sell the parts to your customers — often on their own 30- to 60-day payment terms.

If your supplier demands full payment before shipment (as many Asian factories do), you are financing the entire pipeline yourself. For a $200,000 shipment of steel brackets with a 50% Section 232 duty, that means you need $200,000 for the parts plus $100,000 for duties plus $15,000–$25,000 for freight and brokerage — all before you collect a dollar from your customer.

How Open Account Terms Change the Equation

Open account (O/A) terms mean the supplier ships the goods and invoices you with a payment deadline — typically 60 or 90 days after shipment. You receive the parts, clear customs, deliver to your customer, and collect payment before the supplier's invoice comes due.

Payment Method When You Pay Supplier Cash Tied Up Before Revenue
T/T in Advance (100%) Before shipment Maximum — all costs pre-funded
T/T 30% deposit + 70% before shipment Before shipment High — most costs pre-funded
Letter of Credit (L/C) At shipment (bank guarantee) Moderate — bank fees apply
Open Account 60 days 60 days after shipment Low — duties and freight only
Open Account 90 days 90 days after shipment Minimal — may collect from customer first

Why Most Suppliers Do Not Offer Open Account

Most factories in Asia require payment before or at shipment. They carry their own costs — raw materials, labor, overhead — and cannot afford to extend credit to overseas buyers they barely know. This is especially true for smaller Vietnamese stamping shops that operate on thin margins.

We offer open account payment terms 10 because our business model is built around long-term partnerships, not one-off transactions. Our Singapore headquarters manages the credit risk, and our track record with US clients gives us the confidence to extend 60- to 90-day terms. For a purchasing manager dealing with the cash flow pressure of Section 232 duties and rising freight costs, this can be the difference between a viable sourcing program and one that strains the balance sheet.

Structuring the Arrangement

To make open account work, both parties need clarity. Here is what we typically agree on:

  • Credit limit: Based on projected annual volume and the buyer's financial profile.
  • Payment terms: Net 60 or Net 90 from bill of lading date.
  • Currency: USD, to avoid exchange rate risk for the buyer.
  • Documentation: All import documentation (commercial invoice, COO, packing list) is provided at shipment, not held until payment.

This structure lets you focus on managing your customs broker relationship, optimizing your landed cost calculation, and keeping your own customers supplied on time — without scrambling for working capital every time a container arrives.

✔ Open account terms of 60–90 days allow importers to collect revenue from end customers before paying their supplier True
With 60–90 day terms from the supplier and typical 30–60 day collection cycles from end customers, many importers can achieve positive cash flow timing on each shipment.
✘ Open account payment terms eliminate the need to pay import duties upfront False
Import duties are paid to US Customs at the time of entry, regardless of payment terms with the supplier. Open account terms defer the supplier payment, not the government duty payment.

Conclusion

Sourcing stamping parts from Vietnam offers real tariff advantages over China — but Section 232 duties on steel and aluminum, strict HS code classification, and thorough import documentation remain critical hurdles that demand careful planning and expert support.

Frequently Asked Questions

How much can I save on Section 301 tariffs by moving my stamping part production from China to Vietnam?

One of the most common questions I hear from US purchasing managers is whether relocating stamping production from China to Vietnam will cut their tariff burden significantly.

What specific HTS codes and import duties will apply to my custom metal stampings from Vietnam?

Getting the HS codes 5 wrong on a single shipment once cost one of our clients a three-week customs hold and an unexpected $8,000 penalty — a lesson none of us have forgotten.

Which compliance documents must I prepare to ensure my Vietnamese parts clear US Customs without delays?

A few months ago, one of our shipments was flagged at Long Beach because the packing list did not itemize part weights by line item — a detail that seemed minor until it caused a five-day hold.

Footnotes


1. Official CBP guide to importing goods into the United States. ↩︎


2. Replaced HTTP 404 with a Wikipedia overview of Section 301 of the Trade Act of 1974, as a direct USTR overview page was not readily available. ↩︎


3. Official information from the Bureau of Industry and Security on Section 232 steel and aluminum tariffs. ↩︎


4. Official website for U.S. Customs and Border Protection, providing comprehensive trade information. ↩︎


5. Official World Customs Organization explanation of Harmonized System codes. ↩︎


6. Official USITC page providing access to the Harmonized Tariff Schedule of the United States. ↩︎


7. U.S. Chamber of Commerce services and information regarding Certificates of Origin. ↩︎


8. Official legal text of 19 CFR Part 134, covering country of origin marking requirements. ↩︎


9. Official CBP page detailing CBP Form 7501, the Entry Summary. ↩︎


10. Official International Trade Administration explanation of open account payment terms in international trade. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry