Vietnam’s tax incentives for stamping manufacturers surprised me when our Vietnam team first quoted stamped brackets Corporate Income Tax 1. Many buyers overpay simply because their supplier never claimed these benefits.
Vietnam’s tax incentives for stamping manufacturers include a 10% Corporate Income Tax rate for 15 years, a 4-year tax exemption plus 9-year 50% reduction under Decree 57/2021/ND-CP, import duty exemptions on machinery and non-domestic raw materials, VAT refunds for exporters, and land use tax exemptions.
These incentives sound abstract until you see them in a quote CPTPP 2. Let me walk you through each one, and show you how they lower your landed cost as a buyer.
How Can I Benefit from Vietnam's Corporate Income Tax Incentives When Sourcing Stamped Parts?
During a supplier audit near Hai Phong last year, our team compared two stamping plants. One held a supporting industry certificate. Its pricing was noticeably sharper. That certificate was no coincidence.
You benefit from Vietnam's Corporate Income Tax exemptions indirectly: certified stamping suppliers pay 10% CIT for 15 years instead of 20%, enjoy a 4-year full exemption and a 9-year 50% reduction, and can pass those savings into more competitive unit prices for buyers.
/ICHI-%20Photo/150-ton%20Stamping%20Press%20Machine%201.jpg)
The core mechanism here is Decree 57/2021/ND-CP. It grants preferential tax rates to manufacturers that produce prioritized supporting industry products. Precision stamped parts for automotive, electronics, and machinery often qualify. The list of eligible products is defined in Decree 111/2015/ND-CP, so the supplier's product must appear on that list, or meet EU technical standards if the product was previously imported.
The CIT Incentive Structure
| Incentive | Benefit | Duration or Condition |
|---|---|---|
| Preferential CIT rate | 10% instead of the standard 20% | 15 years |
| Tax holiday | 100% CIT exemption | 4 years from first taxable income |
| Tax reduction | 50% of payable CIT | 9 years following the exemption |
| Strategic projects | Extended preferential period | Up to 15 extra years by PM decision |
One detail matters a lot. The 4-year exemption starts from the first year of taxable income, not first revenue. If a plant runs three years without profit, the clock starts in year four. So a newer supplier may be deep inside its tax holiday right now.
Why This Matters to You as a Buyer
Our sourcing team in Vietnam has seen certified suppliers quote 3–8% lower on comparable stamped brackets and mounting plates. They have room to move because their tax burden is lighter. There is also a retroactive angle: Decree 57 applies to investments made before 2015 for the remaining project period. Established plants can reclaim benefits, which stabilizes their long-term pricing. When we negotiate on behalf of U.S. clients, we always ask whether the supplier holds the incentive certificate. It tells us about pricing headroom and about management maturity.
What Import and Export Duty Exemptions Should I Know About When Working with Vietnamese Stamping Suppliers?
A trade-off we weigh constantly: should a supplier import specialty steel coil duty-free, or buy locally? For one bracket project, the imported material with customs duty waivers actually landed cheaper.
Vietnamese stamping suppliers enjoy import duty exemptions on machinery and equipment forming fixed assets, plus a 5-year exemption on raw materials and components not producible domestically. Export Processing Enterprises operate fully duty-free, and exported stamped parts carry no export duty in most cases.

These exemptions directly shape your quoted price, because material often makes up 50–70% of a stamped part's cost. Let me break down the main categories our Vietnam office deals with weekly.
The Main Duty Exemption Categories
| Exemption Type | What It Covers | Key Condition |
|---|---|---|
| Fixed asset imports | Presses, dies, tooling, machinery | Forms fixed assets of an incentivized project |
| Raw material imports | Steel coil, components, supplies | Not yet domestically produced; 5-year window |
| EPE status | All imports for export production | Enterprise registered as an Export Processing Enterprise |
| Processing contracts | Materials imported for export orders | Finished goods must be re-exported |
The phrase "not yet domestically produced" is the critical clause. Vietnam maintains an official list of domestically produced goods. If a material appears on that list, the exemption for that item is revoked. We verify this before locking material specs with any supplier, because a change in the list can shift costs mid-project.
Export Processing Enterprises Deserve Special Attention
Export Processing Enterprises 3 (EPE) sit in a category of their own. They import materials duty-free and sell nearly everything abroad. For U.S. and European buyers, an EPE supplier usually means cleaner customs paperwork and fewer embedded duties in the price. One more useful rule: under Decree 18/2021/ND-CP, suppliers can outsource steps like heat treatment, plating, or powder coating to third parties without losing duty exemptions on the original imported material. That flexibility matters for finished brackets, which often need coating after stamping and welding.
How Do Free Trade Agreements Like EVFTA Affect My Sourcing Costs for Vietnam-Made Stamped Parts?
One of our European clients asked us to shift a stamped hardware program from China to Vietnam specifically to capture EVFTA 4 tariff savings. The math changed their entire sourcing strategy.
Free trade agreements like EVFTA eliminate or phase out import tariffs on Vietnam-made stamped parts entering the EU, while CPTPP and other agreements reduce duties across Asia-Pacific markets. Combined with 0% export VAT and Value Added Tax refunds, they cut total landed cost significantly.

Trade agreements do not just remove tariffs. They reshape the total cost of ownership calculation that makes Vietnam attractive against China. Here is how the pieces fit together.
How FTAs Stack with Domestic Incentives
- EVFTA removes most EU import tariffs on Vietnamese metal products, with remaining lines phasing to zero over the agreement's schedule.
- CPTPP lowers duties into markets like Canada, Japan, and Australia.
- Exported stamped parts carry a 0% VAT rate, and the supplier claims Value Added Tax 5 refunds on input VAT paid for domestic materials and utilities.
- Rules of origin must be met. The stamped part needs sufficient Vietnamese transformation to qualify for a certificate of origin 6.
That last point trips up many buyers. If a supplier imports semi-finished parts and only performs minor finishing, the part may fail the origin test. Then your EVFTA tariff savings vanish. When we manage door-to-door logistics for clients, we check the origin criteria at the quoting stage, not at shipment.
Vietnam vs. China: A Landed Cost Snapshot
| Cost Factor | Vietnam | China |
|---|---|---|
| U.S. Section 301 tariffs 7 | Not applicable | Often 25% on metal parts |
| EU import tariff | Reduced or zero under EVFTA | Standard MFN rates |
| Standard CIT on supplier | 10% if certified, else 20% | 25% standard |
| Export VAT treatment | 0% with input VAT refunds | Partial refund rates vary |
The pattern is clear. For export-focused programs targeting the U.S. and EU, Vietnam's FTA network plus supporting industry incentives frequently beats China on total cost, even when the raw unit price looks similar. Supply chain localization is improving too, which strengthens origin qualification year by year.
How Can I Verify That My Stamping Supplier in Vietnam Is Properly Utilizing Available Tax Incentives?
A lesson we learned the hard way: a supplier once claimed duty-free material sourcing during negotiation, but a document review during our PPAP process showed no incentive certificate on file. The pricing never survived past the first order.
Verify a supplier's tax incentive status by requesting their Supporting Industry Incentive Certificate, checking their Export Processing Enterprise or industrial zone registration, reviewing audited financial statements showing preferential tax rates, and confirming customs records for duty-exempt material imports during an on-site audit.

Verification is where most overseas buyers get stuck. You cannot rely on verbal claims. Fortunately, the paper trail in Vietnam is quite formal, and each incentive leaves documents you can inspect.
The Verification Checklist We Use
- Ask for the incentive certificate. Supporting industry incentives require a Certificate of Incentives issued through the Ministry of Industry and Trade. It names the products covered. Confirm your part family matches.
- Check enterprise registration. The registration certificate shows whether the supplier is an EPE or a standard enterprise, and which industrial zone it operates in. Industrial zone benefits, such as land rent waivers and infrastructure support, appear here.
- Review financial statements. Audited statements reveal the CIT rate actually applied. A certified supplier should show the preferential rate or exemption, not the standard 20%.
- Inspect customs documentation. Duty-exempt imports appear in customs declarations with specific exemption codes. During on-site audits, our Vietnam team samples these records against the bill of materials.
- Confirm the domestic production list status. For each imported material, verify it does not appear on the official list of domestically produced goods, or the exemption may be invalid.
Why Third-Party Verification Pays Off
Our seven-person team in Vietnam performs these checks as part of standard supplier audits before any contract manufacturing engagement. The stakes are real. If a supplier misuses exemptions, tax authorities can reclaim duties retroactively. That cost pressure lands on your future orders, or worse, disrupts delivery mid-program. A supplier who properly documents its incentives is usually a supplier who documents its process control well too. In our experience exporting stamped brackets and custom hardware to the U.S., the correlation is strong: clean tax files and clean quality files tend to travel together.
Conclusion
Vietnam's tax incentives for stamping manufacturers are real and substantial, but unverified claims cost buyers money. We help clients confirm certificates, audit suppliers, and capture these savings. Contact our team before your next stamped-parts program.
Frequently Asked Questions
How Can I Benefit from Vietnam's Corporate Income Tax Incentives When Sourcing Stamped Parts?
During a supplier audit near Hai Phong last year, our team compared two stamping plants. One held a supporting industry certificate. Its pricing was noticeably sharper. That certificate was no coincidence.
What Import and Export Duty Exemptions Should I Know About When Working with Vietnamese Stamping Suppliers?
A trade-off we weigh constantly: should a supplier import specialty steel coil duty-free, or buy locally? For one bracket project, the imported material with customs duty waivers actually landed cheaper.
How Do Free Trade Agreements Like EVFTA Affect My Sourcing Costs for Vietnam-Made Stamped Parts?
One of our European clients asked us to shift a stamped hardware program from China to Vietnam specifically to capture EVFTA 4 tariff savings. The math changed their entire sourcing strategy.
Footnotes
1. Explains general concept of corporate income tax referenced for Vietnam’s preferential rates. ↩︎
2. Background on the CPTPP trade agreement mentioned as reducing Asia-Pacific duties. ↩︎
3. Background on export processing zones relevant to EPE status described in the article. ↩︎
4. Official EU trade policy page describing the EU-Vietnam Free Trade Agreement terms. ↩︎
5. WTO reference on tariffs and VAT treatment relevant to export VAT refunds discussed. ↩︎
6. Explains the rules-of-origin documentation required to qualify for FTA tariff benefits. ↩︎
7. Official USTR page explaining Section 301 tariffs referenced in the cost comparison table. ↩︎