Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

Why do many parts manufacturing companies choose the powder metallurgy process?

March 2, 2022

Production floor at Thang Long Investment And Equipment, a DEWIN-audited Vietnamese factory

Globally, the powder metallurgy, parts production industry, the automobile manufacturing industry, and the household appliance manufacturing industry are leading the market, especially the automobile manufacturing industry in developed countries, which counts for more than 70% of the powder metallurgy parts market. , Some reports predict that from 2020 to 2026, the existing advantages of the powder metallurgy parts manufacturing industry, such as special materials that can be processed, low production costs, low metal costs, high environmental protection, and the preparation of high-purity materials, will be further optimized. The popularization and application ratio of finished products in the powder metallurgy parts manufacturing industry will reach more than 90%, becoming a “green technology” that is truly loved and well-known by parts manufacturers and demand manufacturers.

Controlled-atmosphere and induction heat-treatment furnace at Changzhi, a DEWIN-audited manufacturing facility
some powder metallurgy porducts

Today, the customized process that Dewin explains to you is precisely about our powder metallurgy technology.
At Dewin, we have powder metallurgy technology that is most in line with the industry trend for the customized projects of supporting basic parts and components, covering the production of parts and components in the automobile manufacturing industry and the home appliance manufacturing industry. By evaluation we are manufacturing materials and products that are currently impossible or difficult to manufacture using other processes, we are also able to manufacture products as per our client’s choice and requirements. If you have special product customization needs but are hard to choose a service trader or a production factory, then choose Dewin Technology, you don’t need to worry about anything, just tell us your designs or needs, this is the commitment we give to your industry.

Controlled-atmosphere and induction heat-treatment furnace at Changzhi, a DEWIN-audited manufacturing facility
some powder metallurgy porducts

Trust Dewin Technology and Trade can create the most suitable service trade for you.

Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What engineering files are required to quote why do many parts manufacturing companies choose the powder metallurgy process? with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry