Skip to main content

🇻🇳 178 profiles · Engineering review

🇻🇳 REAL VIETNAM FACTORY PRICING — 2026

Vietnam Manufacturing Cost Guide 2026

Transparent pricing from 178+ audited Vietnamese factories — organized by process. Every factory verified with our 50-point Dolphin audit. Real photos. Real quotes. No guesswork.

178+
Audited Vietnam Factories
1,700+
Real Factory Photos
16+
Active Free Trade Agreements
50-pt
Dolphin Audit Per Factory

Why We Publish Pricing Ranges

🔍

Transparent Benchmarking

Too many sourcing companies hide pricing to force a sales call. We give you real ranges upfront so you can qualify Vietnam's competitiveness before committing time.

🏭

Based on Real Factory Data

These ranges come from actual RFQs processed through Dewin's 178+ audited factory network — not estimated from public market reports. Updated regularly as factory quotes come in.

📋

Quotes in 48 Hours

Ranges give you a benchmark. Real quotes give you the number to put in your cost model. Submit an RFQ and we match you to the right factory within 48 hours.

Pricing by Manufacturing Process

All estimates from Dewin's Vietnam factory network. Actual quotes depend on design, material, volume, and certification requirements.

⚙️

CNC Machining

$2–$18 per piece

Sample: Aluminum 6061 bracket, ±0.05mm

60+
factories
⏱ Lead time: 7–21 days
📦 MOQ: 50–500 pcs
Factory Certifications
ISO 9001IATF 16949AS9100
Highlights
  • ✓3-axis & 5-axis capability
  • ✓Anodize, plate, powder coat
  • ✓±0.01mm achievable
  • ✓Real-time equipment monitoring
🏭

Die Casting

$0.50–$8 per piece

Sample: A380 aluminum housing, ~200g

25+
factories
⏱ Lead time: 15–35 days
📦 MOQ: 1,000–5,000 pcs
Factory Certifications
ISO 9001IATF 16949
Highlights
  • ✓HPDC & LPDC
  • ✓A380, ADC12, ZA8 alloys
  • ✓In-house tooling capability
  • ✓X-ray porosity inspection
🔩

Injection Molding

$0.10–$5 per piece

Sample: PP enclosure, medium complexity

30+
factories
⏱ Lead time: 10–30 days
📦 MOQ: 500–5,000 pcs
Factory Certifications
ISO 9001ISO 14001
Highlights
  • ✓ABS, PP, PC, Nylon, POM, HDPE
  • ✓Overmolding & insert molding
  • ✓CMM dimensional inspection
  • ✓FDA-grade materials available
🔧

Sheet Metal Fabrication

$5–$60 per piece

Sample: Mild steel panel, 2mm, laser+bend+weld

40+
factories
⏱ Lead time: 7–21 days
📦 MOQ: 100–1,000 pcs
Factory Certifications
ISO 9001AWS D1.1
Highlights
  • ✓Laser cutting, CNC bending, punching
  • ✓TIG/MIG/spot welding
  • ✓Powder coat, zinc plate, galvanize
  • ✓Tight bend radii to spec
🔨

Metal Stamping

$0.05–$3 per piece

Sample: Steel bracket, 1.5mm, progressive die

20+
factories
⏱ Lead time: 14–28 days
📦 MOQ: 5,000–50,000 pcs
Factory Certifications
ISO 9001IATF 16949
Highlights
  • ✓Progressive, compound, transfer dies
  • ✓Steel, stainless, aluminum, copper
  • ✓In-house die tooling
  • ✓High-volume production lines
📐

Aluminum Extrusion

$1.50–$6 per kg

Sample: 6063-T5 custom profile

15+
factories
⏱ Lead time: 14–28 days
📦 MOQ: 200–500 kg
Factory Certifications
ISO 9001ISO 14001
Highlights
  • ✓6061, 6063 alloys
  • ✓Custom die capability
  • ✓Anodize & powder coat finishing
  • ✓Thermal break profiles available
🔥

Investment Casting

$3–$25 per piece

Sample: SS316 valve body, ~300g

12+
factories
⏱ Lead time: 20–40 days
📦 MOQ: 200–2,000 pcs
Factory Certifications
ISO 9001ISO 9001:2015
Highlights
  • ✓Carbon steel, SS304/316, alloy steel
  • ✓Tight net-shape tolerances
  • ✓Wax pattern tooling in-house
  • ✓NDT inspection available
📦

Assembly & Kitting

$5–$40 per assembly

Sample: Multi-component mechanical assembly

35+
factories
⏱ Lead time: 7–21 days
📦 MOQ: Project-based
Factory Certifications
ISO 9001ISO 14001
Highlights
  • ✓Mechanical & electro-mechanical
  • ✓BOM sourcing & kitting
  • ✓Pre-shipment inspection
  • ✓Serialization & labeling

Vietnam's 16+ Free Trade Agreements

FTAs reduce or eliminate import duties for buyers in over 50 countries. Vietnam-made goods give global buyers significant tariff advantages.

CPTPP
📍 Canada, Australia, Japan, Mexico, New Zealand, Chile, Peru, Brunei, Malaysia, Singapore, Vietnam
✅ 0–5% tariff for member countries
EVFTA
📍 All 27 EU member states
✅ Most goods: 0% within 7 years of 2020
RCEP
📍 ASEAN + China, Japan, Korea, Australia, New Zealand
✅ Largest trade bloc by GDP
VKFTA
📍 South Korea
✅ Tariff elimination on 95% of trade
VJEPA
📍 Japan
✅ 0% on most industrial goods
VN–EAEU FTA
📍 Russia, Belarus, Kazakhstan, Armenia, Kyrgyzstan
✅ Preferential rates for CIS markets

Every Factory Price Comes With a 50-Point Audit

Unlike sourcing platforms where factory quality is unknown, every factory in Dewin's pricing network has passed our 50-point Dolphin audit. You're not just getting a price — you're getting a vetted manufacturing partner.

🏭
Facility & Equipment
Production machines, calibration records, maintenance logs
📋
Quality Management
ISO certification, QC procedures, incoming material inspection
👷
Workforce Competency
Operator training records, skill certifications, retention rates
📦
Process Controls
SOP documentation, defect tracking, corrective action system
🔬
Measurement & Testing
CMM, hardness testers, surface profilometers, calibration certs

What You Get With Every RFQ

01
Factory Matching
We match your process, material, and volume to the best-fit audited factories
02
Dolphin Score Review
Only factories above minimum score threshold are invited to quote
03
Real Factory Photos
See the actual production floor, machines, and workstations before committing
04
Competitive Quotes
3 factory quotes within 48 hours — you compare, you choose
05
On-Ground Support
Our Vietnam team manages sampling, approval, and pre-shipment inspection

Vietnam Manufacturing Cost FAQ

Why are Vietnam factory prices competitive globally?

Vietnam benefits from competitive labor rates, a rapidly modernizing manufacturing base, proximity to raw material supply chains in Southeast Asia, and 16+ active Free Trade Agreements that reduce input and export costs. The result: ex-factory pricing that is competitive with China while offering $0 Section 301 tariff exposure to US buyers.

How does Dewin's 50-point Dolphin audit affect factory pricing?

Every factory in Dewin's 178+ network has passed our 50-point Dolphin audit — covering quality systems, equipment calibration, process controls, workforce competency, and documentation standards. Factories with higher Dolphin scores are matched to buyers with tighter quality requirements. Audit costs are absorbed by Dewin — there is no surcharge to buyers.

What Free Trade Agreements cover Vietnam exports?

Vietnam has 16+ active FTAs including CPTPP (covering Canada, Australia, Japan, Mexico, and others), EVFTA (EU-Vietnam), RCEP (ASEAN + China, Japan, Korea, Australia), bilateral FTAs with Korea, Japan, Chile, and more. These FTAs reduce or eliminate import duties for buyers in over 50 countries sourcing from Vietnam.

How long does it take to get a factory quote in Vietnam?

Dewin returns factory-matched quotes within 48 hours of receiving a complete RFQ (drawings + material spec + annual volume). We pre-screen factories from our audited network by process capability, certifications, and current capacity — so you get quotes from the right factories, not just any factory.

Do Vietnam factories meet international quality standards?

Yes. Many factories in Dewin's network hold ISO 9001, IATF 16949 (automotive), AS9100 (aerospace), ISO 14001, and other international certifications. Our 50-point Dolphin audit verifies quality management systems, measurement equipment calibration, production controls, and workforce qualifications — independent of factory self-reporting.

Browse Our 178+ Audited Factories

Pricing ranges are just the start. Browse real factory profiles — with 1,700+ photos, Dolphin audit scores, equipment lists, and process capabilities — before you send an RFQ.

Real factories. Real audits. Real pricing. No guesswork.

Quick Sourcing Inquiry