Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

ABS

Versatile All-Purpose Thermoplastic

Acrylonitrile Butadiene Styrene — the workhorse of engineering plastics. ABS delivers an excellent balance of strength, stiffness, and impact resistance at a competitive cost. Widely used across automotive, consumer electronics, appliances, and industrial equipment.

Get Quote for ABS
ABS

Technical Properties

PropertyValueUnit
Tensile Strength40 – 55MPa
Impact Strength (Izod)200 – 400J/m
Density1.03 – 1.07g/cm³
Heat Deflection Temp88 – 110°C
Flexural Modulus2,100 – 2,800MPa
Shrinkage Rate0.4 – 0.7%

Key Advantages

  • ✓Excellent balance of strength, stiffness, and toughness
  • ✓Easy to machine with good surface finish quality
  • ✓Readily paintable, platable, and bondable
  • ✓Cost-effective for prototypes and production parts

Applications

  • ●Automotive interior trim
  • ●Consumer electronics housings
  • ●Appliance components
  • ●Protective equipment
  • ●Instrument panels

Available Manufacturing Processes

CNC MachiningInjection Molding

Ready to manufacture with ABS?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry