Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Alloy Steel

Industrial Strength & Durability

The bedrock of modern engineering. Known for exceptional tensile strength, toughness, and superior load-bearing capacity for heavy-duty applications.

Get Quote for Alloy Steel
Alloy Steel

Technical Properties

PropertyValueUnit
Tensile Strength400 – 1600+MPa
Yield Strength250 – 1200+MPa
Density7.80 – 7.87g/cm³
Thermal Conductivity25 – 55W/m·K
Elastic Modulus190 – 210GPa
Melting Point1420 – 1540°C

Key Advantages

  • ✓Unrivaled strength and toughness
  • ✓Excellent heat treatment responsiveness
  • ✓Superior machinability and formability
  • ✓Cost-effective for high mechanical performance

Applications

  • ●Automotive engine components
  • ●Industrial gears
  • ●Structural fasteners
  • ●Hydraulic valves
  • ●Drivetrain components

Available Manufacturing Processes

CNC MachiningForgingStampingHeat Treatment

Ready to manufacture with Alloy Steel?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry