Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Aluminum

Lightweight & High-Performance

A silvery-white light metal with excellent strength-to-weight ratio, superior corrosion resistance, and excellent thermal and electrical conductivity. The material of choice for aerospace, automotive, electronics, medical equipment, and precision machinery.

Get Quote for Aluminum
Aluminum

Technical Properties

PropertyValueUnit
Tensile Strength70 – 600MPa
Yield Strength30 – 500MPa
Density2.63 – 2.85g/cm³
Thermal Conductivity120 – 230W/m·K
Elastic Modulus68 – 72GPa
Melting Point580 – 660°C

Key Advantages

  • ✓Extremely lightweight — density only one-third of steel
  • ✓Excellent machinability with short processing cycles
  • ✓Superior surface treatment options (anodizing, powder coating)
  • ✓100% recyclable — sustainable manufacturing

Applications

  • ●Aerospace structures
  • ●Automotive components
  • ●Electronic enclosures
  • ●Medical device brackets
  • ●Heat sinks

Available Manufacturing Processes

CNC MachiningDie CastingExtrusionStamping

Ready to manufacture with Aluminum?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry