Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Aluminum Sheet

Lightweight & Formable

One of the most commonly used materials in stamping and bending, valued for light weight, excellent formability, and corrosion resistance. Formed with lower force than steel for high-efficiency production.

Get Quote for Aluminum Sheet
Aluminum Sheet

Technical Properties

PropertyValueUnit
Density2.68 – 2.72g/cm³
Tensile Strength110 – 290MPa
Elongation8 – 25%
Available Thickness0.5 – 6.0mm

Key Advantages

  • ✓Excellent formability — deep drawing with minimal cracking
  • ✓One-third the weight of steel
  • ✓Natural corrosion resistance via oxide layer
  • ✓Smooth surfaces ideal for anodizing and coating

Applications

  • ●Electrical enclosures
  • ●Panels & covers
  • ●Brackets
  • ●Heat shields
  • ●Automotive sheet parts

Available Manufacturing Processes

StampingBendingDeep DrawingLaser Cutting

Ready to manufacture with Aluminum Sheet?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry