Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Brass

Precision & Elegance

The "Gold of Industry" — a high-performance alloy balancing exceptional machinability with superior corrosion resistance and high electrical conductivity. The most cost-effective choice for high-volume precision parts.

Get Quote for Brass
Brass

Technical Properties

PropertyValueUnit
Machinability Rating100%
Tensile Strength330 – 550MPa
Electrical Conductivity25 – 28% IACS
Density8.4 – 8.7g/cm³
Thermal Conductivity115 – 120W/m·K
Melting Point885 – 930°C

Key Advantages

  • ✓Industry benchmark machinability (100% rating)
  • ✓Natural antimicrobial properties
  • ✓Low friction and spark resistance
  • ✓Premium golden aesthetic finish

Applications

  • ●Electronic connectors
  • ●Valve bodies
  • ●Musical instruments
  • ●Luxury hardware
  • ●Hydraulic fittings

Available Manufacturing Processes

High-Speed Turning5-Axis MillingPrecision Threading

Ready to manufacture with Brass?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry