Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Copper

Superior Conductivity

A metal with extremely high ductility and excellent thermal and electrical conductivity. Indispensable in electronics, electrical, heat dissipation, and precision instrument fields.

Get Quote for Copper
Copper

Technical Properties

PropertyValueUnit
Electrical Conductivity25 – 101% IACS
Thermal Conductivity110 – 400W/m·K
Density8.80 – 8.96g/cm³
Tensile Strength200 – 450MPa
Melting Point880 – 1083°C
Hardness40 – 150HV

Key Advantages

  • ✓Highest electrical conductivity among common metals
  • ✓Excellent thermal conductivity up to 400 W/m·K
  • ✓Natural corrosion resistance
  • ✓Wide range of surface treatments available

Applications

  • ●5G base station heat sinks
  • ●Semiconductor fixtures
  • ●Conductive busbars
  • ●Heat exchangers
  • ●Electronic contacts

Available Manufacturing Processes

CNC MachiningEDMCold ForgingStamping

Ready to manufacture with Copper?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry