Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Magnesium

Ultra-Lightweight Structural Metal

The lightest structural metal available — 33% lighter than aluminum and 75% lighter than steel. Magnesium alloys deliver exceptional strength-to-weight ratios, excellent EMI shielding, and superior vibration damping. Increasingly adopted in automotive, aerospace, electronics, and defense applications where every gram matters.

Get Quote for Magnesium
Magnesium

Technical Properties

PropertyValueUnit
Tensile Strength160 – 340MPa
Yield Strength130 – 280MPa
Density1.74 – 1.83g/cm³
Elastic Modulus44 – 45GPa
Thermal Conductivity51 – 156W/m·K
Melting Point470 – 650°C

Key Advantages

  • ✓Lightest structural metal — density just 1.74 g/cm³
  • ✓Excellent EMI/RFI shielding properties
  • ✓Superior vibration damping — 10× better than aluminum
  • ✓Good machinability with high cutting speeds achievable

Applications

  • ●Laptop & phone housings
  • ●Automotive steering wheels & seat frames
  • ●Drone & UAV frames
  • ●Camera bodies
  • ●Aerospace brackets

Available Manufacturing Processes

CNC MachiningDie Casting

Ready to manufacture with Magnesium?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry