Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Mild Steel

Versatile Metal Forming Workhorse

The backbone of sheet metal fabrication. Low carbon content (0.05%–0.25%) provides the perfect balance of ductility, strength, and weldability for stamping, deep drawing, and precision bending.

Get Quote for Mild Steel
Mild Steel

Technical Properties

PropertyValueUnit
Tensile Strength370 – 550MPa
Yield Strength210 – 350MPa
Density7.85g/cm³
Elongation15 – 30%
Elastic Modulus200 – 210GPa
Hardness50 – 70HRB

Key Advantages

  • ✓Exceptional formability for intricate stamping
  • ✓Superior weldability (MIG, TIG, spot welding)
  • ✓Natural ferromagnetic properties
  • ✓Most competitive cost-to-strength ratio

Applications

  • ●Automotive chassis
  • ●Industrial brackets
  • ●Enclosures
  • ●Structural frames
  • ●Connectors

Available Manufacturing Processes

Progressive Die StampingCNC BendingDeep DrawingWelding

Ready to manufacture with Mild Steel?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry