Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

Nylon (PA6/PA66)

Tough, Wear-Resistant Engineering Plastic

One of the most widely used engineering thermoplastics. Nylon offers an exceptional balance of mechanical strength, wear resistance, and chemical stability — making it the go-to material for gears, bearings, bushings, and structural components across virtually every industry.

Get Quote for Nylon (PA6/PA66)
Nylon (PA6/PA66)

Technical Properties

PropertyValueUnit
Tensile Strength70 – 85MPa
Flexural Modulus2,400 – 3,200MPa
Density1.12 – 1.15g/cm³
Melting Point220 – 265°C
Water Absorption (24h)1.0 – 1.6%
Coefficient of Friction0.2 – 0.4–

Key Advantages

  • ✓Outstanding wear and abrasion resistance
  • ✓High mechanical strength with good flexibility
  • ✓Excellent chemical resistance to oils, fuels, and solvents
  • ✓Self-lubricating properties reduce need for external lubrication

Applications

  • ●Gears & sprockets
  • ●Bearings & bushings
  • ●Cable ties & fasteners
  • ●Structural brackets
  • ●Conveyor components

Available Manufacturing Processes

CNC MachiningInjection Molding

Ready to manufacture with Nylon (PA6/PA66)?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry