Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

PEEK

King of High-Performance Plastics

A premium semi-crystalline thermoplastic at the apex of engineering plastics. Extraordinary mechanical strength, extreme temperature resistance (up to 260°C), and chemical inertness.

Get Quote for PEEK
PEEK

Technical Properties

PropertyValueUnit
Tensile Strength95 – 110MPa
Flexural Modulus3.7 – 4.1GPa
Density1.30 – 1.32g/cm³
Melting Point343°C
Heat Deflection Temp150 – 160°C
Flammability RatingV-0UL 94

Key Advantages

  • ✓Continuous operation up to 260°C (500°F)
  • ✓Metal-like strength-to-weight ratio
  • ✓Superior chemical resistance to nearly all chemicals
  • ✓Biocompatible — withstands repeated sterilization

Applications

  • ●Aerospace connectors
  • ●Spinal cages & implants
  • ●Oil & gas seals
  • ●Semiconductor wafer carriers
  • ●Valve seats

Available Manufacturing Processes

CNC MillingCNC TurningMulti-Stage AnnealingDiamond-Coated Tooling

Ready to manufacture with PEEK?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry