Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

Polycarbonate (PC)

Optical Clarity & Impact Strength

A high-performance transparent thermoplastic combining glass-like optical clarity with exceptional impact resistance — up to 250× stronger than glass. The premier material for optical lenses, safety shields, electronics housings, and medical devices requiring transparency.

Get Quote for Polycarbonate (PC)
Polycarbonate (PC)

Technical Properties

PropertyValueUnit
Tensile Strength55 – 75MPa
Impact Strength (Izod)600 – 850J/m
Density1.20 – 1.22g/cm³
Light Transmission88 – 90%
Heat Deflection Temp130 – 140°C
Flammability RatingV-2 to V-0UL 94

Key Advantages

  • ✓Near-optical transparency with 88–90% light transmission
  • ✓Extreme impact resistance — virtually unbreakable
  • ✓Good dimensional stability and tight tolerances achievable
  • ✓Inherently flame-retardant (UL 94 V-2 to V-0)

Applications

  • ●Safety shields & guards
  • ●Optical lenses
  • ●Electronics enclosures
  • ●Medical device housings
  • ●LED light covers

Available Manufacturing Processes

CNC MachiningInjection Molding

Ready to manufacture with Polycarbonate (PC)?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry