Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

POM (Delrin)

The Plastic Steel

A high-performance thermoplastic with metal-like strength and lightweight benefits. Known as "Plastic Steel" for its exceptional dimensional stability, high rigidity, and natural lubricity.

Get Quote for POM (Delrin)
POM (Delrin)

Technical Properties

PropertyValueUnit
Tensile Strength60 – 70MPa
Flexural Modulus2500 – 3000MPa
Density1.41 – 1.43g/cm³
Water Absorption (24h)0.2 – 0.25%
Coefficient of Friction0.2 – 0.35–
Melting Point165 – 175°C

Key Advantages

  • ✓Exceptional dimensional stability — low water absorption
  • ✓High rigidity and creep resistance
  • ✓Natural lubricity — low coefficient of friction
  • ✓Easy to machine with smooth, burr-free finish

Applications

  • ●Precision gears
  • ●Pump impellers
  • ●Electronic insulators
  • ●Fuel system components
  • ●Consumer goods

Available Manufacturing Processes

CNC MillingCNC TurningBead BlastingLaser Engraving

Ready to manufacture with POM (Delrin)?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry