Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

PTFE (Teflon)

Master of Low Friction

A unique fluoropolymer with one of the lowest coefficients of friction of any solid material. The ultimate "non-stick" solution for high-performance seals, gaskets, and sliding components.

Get Quote for PTFE (Teflon)
PTFE (Teflon)

Technical Properties

PropertyValueUnit
Coefficient of Friction0.05 – 0.10–
Tensile Strength20 – 35MPa
Elongation at Break200 – 400%
Density2.14 – 2.20g/cm³
Service Temperature-200 to +260°C
Dielectric Strength18 – 20kV/mm

Key Advantages

  • ✓Unrivaled lubricity — friction coefficient as low as 0.05
  • ✓Virtually impervious to all acids, bases, and solvents
  • ✓Extreme temperature range: -200°C to +260°C
  • ✓Excellent dielectric properties for electrical insulation

Applications

  • ●Chemical valve seats
  • ●Surgical tools
  • ●Cable insulation
  • ●Piston rings
  • ●Slide bearings

Available Manufacturing Processes

CNC MillingCNC TurningPrecision Machining

Ready to manufacture with PTFE (Teflon)?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry