Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Stainless Steel

Toughness & Corrosion Resistance

A high-performance metal renowned for exceptional mechanical strength, heat resistance, and excellent corrosion resistance. Central to medical devices, food industry, and aerospace applications.

Get Quote for Stainless Steel
Stainless Steel

Technical Properties

PropertyValueUnit
Tensile Strength515 – 1300MPa
Yield Strength205 – 1100MPa
Density7.70 – 8.05g/cm³
Hardness150 – 450HB/HRC
Thermal Conductivity11.2 – 21.5W/m·K
Melting Point1370 – 1510°C

Key Advantages

  • ✓Exceptional mechanical strength and heat resistance
  • ✓Excellent corrosion resistance in harsh environments
  • ✓Wide range of grades for diverse applications
  • ✓High mirror finish achievable (Ra 0.4μm)

Applications

  • ●Medical implants
  • ●Food processing equipment
  • ●Marine components
  • ●Chemical processing
  • ●Aerospace parts

Available Manufacturing Processes

CNC MillingCNC TurningSwiss MachiningLaser Cutting

Ready to manufacture with Stainless Steel?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry