Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Stainless Steel Sheet

Versatile Fabrication Core

No material offers the same balance of formability and structural integrity for mass production. Cold-formed without cracking, it is the undisputed champion for precision stamping and complex bending.

Get Quote for Stainless Steel Sheet
Stainless Steel Sheet

Technical Properties

PropertyValueUnit
Thickness Range0.5 – 6.0mm
Tensile Strength270 – 500MPa
Elongation30 – 40%
Surface Hardness45 – 65HRB

Key Advantages

  • ✓Exceptional ductility for deep drawing and tight-radius bending
  • ✓Uniform thickness consistency across large areas
  • ✓Cost-effective scalability for large-scale manufacturing
  • ✓Diverse surface finishing options

Applications

  • ●Electronics enclosures
  • ●Automotive frames
  • ●Industrial brackets
  • ●Structural panels
  • ●Medical equipment housings

Available Manufacturing Processes

Progressive Die StampingCNC BendingDeep DrawingSpot Welding

Ready to manufacture with Stainless Steel Sheet?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry