Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Titanium

Pushing Engineering Limits

Offering the strength of high-strength steel at only 56% of its weight. Virtually immune to corrosion and the most compatible metal with the human body. The material that defines aerospace and medical science.

Get Quote for Titanium
Titanium

Technical Properties

PropertyValueUnit
Tensile Strength240 – 1000+MPa
Yield Strength170 – 900+MPa
Density4.43 – 4.51g/cm³
Thermal Conductivity6.7 – 22W/m·K
Elastic Modulus102 – 114GPa
Melting Point1650 – 1670°C

Key Advantages

  • ✓Extreme power-to-weight ratio
  • ✓Self-healing oxide layer — practically rust-proof
  • ✓Human-grade biocompatibility for implants
  • ✓Thermal stability at high temperatures

Applications

  • ●Aerospace turbines
  • ●Medical implants
  • ●Chemical processing
  • ●Marine hardware
  • ●Dental components

Available Manufacturing Processes

CNC MillingCNC TurningEDM3D Printing (SLS)

Ready to manufacture with Titanium?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry