Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Tool Steel

Industrial Durability Powerhouse

Carbon and alloy steels with incredible hardness, abrasion resistance, and the ability to hold a cutting edge at extremely high temperatures. The heavyweight champion of CNC machining.

Get Quote for Tool Steel
Tool Steel

Technical Properties

PropertyValueUnit
Hardness (Heat Treated)50 – 66HRC
Density7.7 – 8.1g/cm³
Tensile Strength600 – 2000+MPa
Thermal Conductivity20 – 45W/m·K

Key Advantages

  • ✓Extreme hardness up to 66 HRC after heat treatment
  • ✓Superior abrasion and wear resistance
  • ✓Maintains cutting edge at high temperatures
  • ✓Multiple series for different applications (W, A, D, M, H)

Applications

  • ●Stamping dies
  • ●Mold cores
  • ●Industrial blades
  • ●Drill bits
  • ●Forging dies

Available Manufacturing Processes

Hard Milling/TurningEDMVacuum Heat TreatmentPVD Coating

Ready to manufacture with Tool Steel?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry