Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsEngineering Plastic

UHMW-PE

Ultimate Wear & Low-Friction Polymer

Ultra-High Molecular Weight Polyethylene — engineered for extreme wear environments. UHMW-PE has the highest abrasion resistance of any thermoplastic, with a self-lubricating surface and outstanding chemical inertness. The material of choice for conveyor guides, wear strips, dock bumpers, and food-grade sliding components.

Get Quote for UHMW-PE
UHMW-PE

Technical Properties

PropertyValueUnit
Tensile Strength20 – 45MPa
Abrasion Resistance (Sand Slurry)100(index)
Density0.93 – 0.94g/cm³
Coefficient of Friction0.10 – 0.22–
Impact Strength (Izod)No Break–
Service Temperature-200 to +80°C

Key Advantages

  • ✓Highest abrasion resistance of any thermoplastic
  • ✓Self-lubricating — coefficient of friction as low as 0.10
  • ✓FDA-compliant grades available for food contact
  • ✓Excellent chemical and moisture resistance

Applications

  • ●Conveyor guides & wear strips
  • ●Dock bumpers & fenders
  • ●Food processing equipment
  • ●Medical implant components
  • ●Chain guides & sprockets

Available Manufacturing Processes

CNC MillingCNC Turning

Ready to manufacture with UHMW-PE?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry