Skip to main content

🇻🇳 178 profiles · Engineering review

← Back to MaterialsMetal

Zinc Alloy

Cost-Effective Precision

A highly machinable engineering material valued for dimensional stability, excellent surface finish, and cost efficiency. Ideal for precision components with complex geometry.

Get Quote for Zinc Alloy
Zinc Alloy

Technical Properties

PropertyValueUnit
Tensile Strength280 – 350MPa
Density6.6 – 6.9g/cm³
Elastic Modulus83 – 96GPa
Melting Point380 – 390°C

Key Advantages

  • ✓Outstanding machinability with fast cycle times
  • ✓High dimensional stability with minimal deformation
  • ✓Excellent surface finish for plating and coating
  • ✓Lower manufacturing cost vs aluminum or steel

Applications

  • ●Functional housings
  • ●Connectors
  • ●Brackets
  • ●Appearance-critical parts

Available Manufacturing Processes

CNC MillingCNC TurningDrillingTapping

Ready to manufacture with Zinc Alloy?

Upload your CAD files and get a quote within 24 hours from our vetted Vietnam supplier network.

Quick Sourcing Inquiry