Skip to main content

🇻🇳 178 profiles · Engineering review

Typical response: 24–48 hours

Discover How Much You Could Save Manufacturing in Vietnam

Upload your drawings and get a detailed, no-obligation quote from our engineering team. Compare pricing, lead times, and manufacturing options for your specific parts.

Ordering many parts? Submit your whole parts list at once →

1
Upload & Contact
2
Specs & Materials
3
Requirements & Review

Upload CAD & Contact Details

Drag & drop your CAD files here

or browse files

.STEP.STP.IGES.STL.OBJ.3MF.PDF.DXF.DWG.X_T.SAT

Also accepted: ZIP packages, drawing photos, spec sheets

Max file size: 50MB per file

Don't have a drawing? Test the flow with our sample CAD part.Download Sample CAD (.STEP)
Your files are stored privately and encrypted at rest. Access is limited to DEWIN engineering staff — never shared with any factory without an NDA. Files are deleted on request.

Contact Information

🔒 Your designs are protected. Typical response: 24–48 hours. Timing depends on drawing completeness and supplier availability. NDA available on request.

Why 500+ Parts Have Been Sourced Through Us

ISO 9001 Certified

Quality management across all processes

NDA Available

Your designs are fully protected

100% Free Quote

No obligation, no hidden fees

24–48 Hour Response

Fast turnaround on all quote requests

What to Include

  • 2D/3D CAD drawings with dimensions
  • Material specifications
  • Quantity & annual volume
  • Surface finish requirements
  • Tolerance callouts
  • Any certifications needed

Accepted File Formats

.step
.stp
.iges
.igs
.stl
.obj
.3mf
.pdf
.dxf
.dwg
.x_t
.sat

Prefer to email directly?

Send your drawings and project details to:

Email Us

Quick Sourcing Inquiry