Skip to main content

🇻🇳 178 profiles · Engineering review

178+ Audited Vietnam Factories

See Inside Our Factories.
Not Just a Listing. Real Audits.

Request a virtual factory tour, schedule a sourcing strategy call, or arrange an on-site Vietnam visit. Our on-the-ground team gives you access that no online marketplace can match — 1,700+ real photos, 659+ video clips, and a 50-point Dolphin Audit for every factory.

178+
Audited Factories
1,700+
Real Factory Photos
659+
On-Site Video Clips
50-pt
Dolphin Audit Every Factory

Choose How You Want to Connect

Three ways to see inside our factory network — from a quick virtual preview to a full on-site visit in Vietnam.

Most Popular

Virtual Factory Tour

Our team curates a video and photo walkthrough of 2–3 matched factories tailored to your specific parts. See real on-site footage — machines, inspection stations, finished goods areas.

  • 1,700+ real factory photos
  • 659+ on-site video clips
  • Equipment inventory per factory
  • 50-point Dolphin Audit scorecard
30 Minutes

Sourcing Strategy Call

30-minute video call with a Dewin sourcing expert. We walk through your parts, qualification requirements, certifications needed, and match them to our audited factory network live.

  • Factory matching for your processes
  • FTA advantage review (CPTPP/EVFTA/RCEP)
  • Dolphin Audit Q&A session
  • Sample audit report walkthrough
By Appointment

On-Site Vietnam Visit

For serious buyers — Dewin arranges a guided on-site factory visit in Vietnam. Our on-the-ground team accompanies you, facilitates technical discussions, and documents the visit.

  • Physical factory floor access
  • Bilingual on-ground team
  • Pre-visit audit prep package
  • Post-visit sourcing roadmap

Our Factory Network by Process

178+ audited factories across Vietnam. Each physically visited, scored on 50 criteria, and photographed by our on-the-ground team.

Manufacturing ProcessAudited FactoriesCertification LevelFeatured Factories
CNC Precision Machining60+ISO 9001Bach Tung, NAPEC, Hirata, HDP
Aluminum Die Casting25+IATF 16949 readyEguchiseiko, Kinzoku, Altop, Minh Quang
Sheet Metal Fabrication35+ISO 9001Huynh Duc (multi-process)
Injection Molding20+ISO 9001Ming Chuan, Minh Quang, Lac Hao
Investment Casting15+ISO 9001Kobayashi Casting Vietnam
Metal Stamping18+ISO 9001Multi-process stamping+welding
Industrial Fasteners10+Grade-to-spec hardnessLidovit Trading and Industrial
Valve & Fluid Components8+ISO 9001Shin Yi Valves Vietnam
50-Point Dolphin Audit

Every Factory in Our Network Is Physically Audited

No self-registration. No unverified profiles. Every factory on dewinvietnam.com has been physically visited by our team and scored across 5 pillars before being listed.

Pillar 1

Facility & Safety — 10 Criteria

10 criteria: building condition, fire safety, aisle clearance, hazmat storage, PPE compliance, emergency exits, first aid, housekeeping standard (5S), lighting, ventilation.
Pillar 2

Equipment & Capacity — 10 Criteria

10 criteria: machine age and condition, maintenance records, spare parts inventory, capacity utilization, inspection equipment (CMM/VMM/gauges), calibration certificates, tooling management, CNC program control, secondary process capability, subcontractor policy.
Pillar 3

Quality Systems — 10 Criteria

10 criteria: ISO certification status, IQC incoming inspection, in-process QC, final inspection procedure, non-conformance records, corrective action process, customer complaint log, SPC/Cpk capability, FAI documentation, PPAP capability.
Pillar 4

Workforce & Management — 10 Criteria

10 criteria: operator skill levels, training records, key person dependency risk, management engagement during audit, technical English capability, workforce stability, OT policy, sub-contract worker ratio, production planning, KPI management board.
Pillar 5

Export Compliance — 10 Criteria

10 criteria: Certificate of Origin (CO) familiarity, VCCI Form B capability, FTA-specific CO forms (CPTPP/EVFTA/RCEP), substantial transformation documentation, anti-circumvention awareness, customs broker relationship, packing list accuracy, import/export license compliance, restricted goods policy, audit trail for CBP requests.
Tier 1
90–100 / 100
Premium
Tier 2
80–89 / 100
Qualified
Tier 3
55–69 / 100
Conditional
Probationary
< 55 / 100
Under Review

16+ Free Trade Agreements Covering Your Target Markets

Vietnam's FTA network is one of the most extensive in Asia. Sourcing from our audited factories gives you access to preferential duty rates into the US, EU, UK, Japan, and beyond.

CPTPP
11 nations • Canada, Australia, Japan, Mexico, New Zealand + more

Reduced or zero duty on manufactured goods into CPTPP member markets

EVFTA
EU + Vietnam • 27 EU member states

Up to 99% of tariff lines phased to zero — strong for precision components

RCEP
15 Asia-Pacific nations • China, Japan, South Korea, Australia, ASEAN

Largest FTA by GDP — reduces intra-regional sourcing friction

UKVFTA
UK + Vietnam • United Kingdom post-Brexit

99% tariff elimination phased in — direct post-Brexit sourcing route

What Buyers Say After Seeing Inside Our Factories

"Seeing inside the factory — the actual machines, inspection area, and the audit scorecard — gave me more confidence than a hundred Alibaba profiles ever could."

FG
Francisco García Quintana 🇬🇧
MD, LAROME

"The virtual tour was the convincer. Real photos of the CMM machine, the finished parts storage, the 5S board — you can't fake that. I knew this was a serious factory."

GW
Greg L. Wilhite 🇺🇸
President, DOMS

"I asked to see the inspection area specifically. Dewin sent me video from the factory floor the same week. That level of access and transparency is what makes them different."

VS
Vishnu Shanker 🇺🇸
Supply Chain Lead, Texas Technology
Factory Tour Request

See Inside the Factories. Ask the Hard Questions.

  • Real photos from every factory floor — no stock images
  • 50-point Dolphin Audit scorecard for each factory
  • Equipment inventory & inspection capability per factory
  • FTA Certificate of Origin eligibility per factory
  • Our on-ground team answers technical questions
Response within 24 business hours

We'll reach out with a tailored factory shortlist and tour package within one business day of receiving your request.

Request Your Factory Tour

Factory Tour FAQ

What is included in a virtual factory tour?
A Dewin virtual factory tour includes a curated selection of our on-site factory photos and videos (1,700+ real images and 659+ video clips), a walkthrough of the factory's 50-point Dolphin Audit QCLDM scorecard, equipment highlights relevant to your parts, and a live Q&A with our sourcing team. You see the actual factory floor — not stock photos.
Can I physically visit a factory in Vietnam?
Yes. Dewin can arrange on-site factory visits for qualified buyers. Our on-the-ground team in Vietnam will accompany you, pre-arrange with the factory, and translate as needed. We typically schedule in-person visits 2–3 weeks in advance. Contact us to discuss a Vietnam factory visit trip.
What does the Dolphin Audit score mean for the factories I'll see?
Every factory in our network has been physically audited using our 50-point Dolphin Audit framework across 5 pillars: Facility & Safety, Equipment & Capacity, Quality Systems, Workforce & Management, and Export Compliance. Factories are scored 0–100 and assigned a QCLDM tier (Tier 1: 85+, Tier 2: 80–89, Tier 3: 55–69). Only Tier 1 and Tier 2 factories are featured in our active sourcing network.
How quickly can I get factory options after requesting a tour?
For standard processes (CNC machining, die casting, sheet metal, injection molding, stamping, investment casting), we can typically present a shortlist of 2–3 audited, matched factories within 3–5 business days of receiving your part specifications. The factory tour request starts the conversation; drawings close it.
Do I need to speak Vietnamese to work with your factory network?
No. All factory communication, technical document translation, quality inspection reports, and audit documentation are handled by Dewin's bilingual on-the-ground team. Your single point of contact at Dewin manages everything in English on your behalf.

Ready to Browse Our Factory Network?

178+ audited factories. Real photos. Real audit scores. No anonymous listings.

Quick Sourcing Inquiry