Skip to main content

🇻🇳 178 profiles · Engineering review

50-Point Dolphin Audit · 178+ Verified Factories · 1,700+ Real Photos

Vietnam Supplier Qualification:
How We Audit Every Factory

Not every Vietnam factory is ready for export-quality production. Here's exactly how Dewin's on-ground team discovers, qualifies, and monitors the 178+ suppliers in our audited network — so you don't have to.

178+
Audited Factories
50
Audit Checkpoints
1,700+
Real Factory Photos
50+
Manufacturing Processes

Why Most Vietnam Factory Searches Fail

✗

Alibaba / directory listings are unverified

Anyone can list on Alibaba. No on-site audit, no equipment verification. You're trusting a profile photo.

✗

Trade fairs give you brochures, not audits

Meeting a supplier at a trade show tells you about their marketing department — not their production floor.

✗

Virtual audits miss critical factory realities

A factory looks very different on a video call vs. a walk of the actual production floor, toolroom, and QC bench.

✗

Language barriers cause spec errors

Without a bilingual technical team on the ground, drawing interpretation errors are common and expensive.

✓ The Dewin Difference

✓

Physical on-site audit before any factory enters our network

✓

50-point scored inspection across 5 pillars: facility, equipment, QC, workforce, compliance

✓

1,700+ real photos from audit visits — machines, production lines, QC benches, packaging

✓

Bilingual technical team reviews every drawing before sending to factory

✓

Pre-shipment inspection on every production order

✓

Ongoing periodic re-audits to maintain quality standards

Our 6-Step Supplier Qualification Process

Every factory in our network went through every step of this process before being approved. No shortcuts.

1

Factory Discovery

Our on-ground team in Ho Chi Minh City, Binh Duong, Dong Nai, and Hai Phong actively identifies candidate factories through local industrial networks, zone development authorities, and referrals from existing verified suppliers.

Binh Duong IZLong An IZDong Nai IZHCMCHanoiHai Phong
2

Document & Registration Verification

Before setting foot on the factory floor, we verify key documents to screen out shell companies and recently-formed fronts.

✓ Business registration certificate
✓ Tax identification number
✓ Export license (if applicable)
✓ ISO certification verification (original cert, not photocopy)
✓ Years in operation / ownership history
✓ Customer reference check (existing export clients)
3

On-Site Dolphin Audit (50 Points)

Our trained auditors conduct a full physical inspection using the Dolphin scoring framework. Factories must score 70/100 or above to join our network.

Pillar 1: Facility & Safety

10 pts
  • • Building condition and fire safety systems
  • • Electrical installation compliance
  • • Worker safety equipment and signage
  • • Storage and material handling layout
  • • Environmental waste handling

Pillar 2: Equipment & Capacity

10 pts
  • • Machine age, brand, and condition
  • • Production capacity vs. stated capacity
  • • Toolroom and fixture capability
  • • Equipment maintenance records
  • • Bottleneck identification

Pillar 3: Quality Systems

10 pts
  • • Incoming material inspection process
  • • In-process quality check stations
  • • Final inspection equipment (CMM, gauges)
  • • Non-conformance tracking and rework
  • • Customer complaint history

Pillar 4: Workforce & Management

10 pts
  • • Workforce size and skill level
  • • Management stability and experience
  • • Technical team English communication
  • • Production scheduling system
  • • Turnover rate and worker retention

Pillar 5: Export & Compliance Readiness

10 pts
• Vietnam-origin C/O documentation experience
• INCOTERMS capability (FOB, CIF, EXW)
• Packing and labeling for US/EU import
• Prior US or EU export track record
• NDA and IP protection procedures
• Banking and USD payment capability
70+
Minimum Dolphin score required for network acceptance. Factories scoring below 70 are rejected or placed on a 90-day improvement plan before re-audit.
4

Photo & Video Documentation

Every audit visit includes a full photo and video walkthrough. This is why our factory database is unlike anything else in the industry — every factory profile shows real machines, real workers, real conditions.

1,700+
Real photos in network
659+
Factory video clips
10+
Photos per factory min.
Accuracy Commitment: Zero stock photos. Zero AI-generated images. Every photo in our database was taken by our team, on-site, at the actual factory.
5

Sample & First Article Approval

For every new project, the factory produces sample parts before production commit. Our technical team inspects dimensions, surface finish, and functionality against your engineering drawings.

✓Full dimensional inspection against drawing tolerances
✓Surface finish measurement (Ra/Rz where specified)
✓Material certificate review (CoC, test reports)
✓Function test where applicable
✓Photo report sent to buyer before approval
✓Production not released until buyer sign-off
6

Ongoing Monitoring & Re-Audit

Qualification isn't a one-time event. Our team monitors performance across every order and re-audits factories periodically to maintain quality standards.

Per-Order Monitoring

  • ✓ Production progress photos during run
  • ✓ Pre-shipment inspection (100% or AQL)
  • ✓ Packing and labeling check before container load
  • ✓ C/O and customs documentation review

Periodic Re-Audit

  • ✓ Dolphin score re-evaluated annually
  • ✓ Equipment and capacity updates logged
  • ✓ Certification renewal tracking
  • ✓ Management change alerts

178+ Audited Factories Across 50+ Processes

Our qualified supplier network covers the full range of Vietnam manufacturing capabilities.

⚙️

CNC Machining

Precision turning & milling. Tolerances to ±0.005 mm. 3-, 4-, and 5-axis capability.

CNC turning, milling, 5-axis, EDM, grinding
🔩

Die Casting

Aluminum & zinc HPDC. Tolerances to ±0.05 mm. Ra 0.8–3.2 μm surface finish.

HPDC, LPDC, gravity casting, post-machine
🏗️

Sheet Metal & Welding

Laser cutting, punching, bending, MIG/TIG/robotic welding, powder coating.

Laser cut, press brake, MIG, TIG, spot, robotic weld
🧩

Injection Molding

Single & multi-cavity tooling. PP, PE, ABS, PA6, PC. Mold life 300K–1M shots.

Injection molding, blow molding, two-shot, overmold
🔄

Stamping & Forming

Progressive die, transfer die, deep draw. Tolerances to ±0.1 mm. High-volume capability.

Progressive die, transfer, deep draw, fine blanking
🔧

Assembly

Sub-assembly and full assembly. Hardware insertion, functional testing, kitting, BOM sourcing.

Mechanical assembly, harness, kitting, packaging

How Dewin Factory Qualification Compares

Most platforms show you an anonymous supplier. We show you the factory floor.

Qualification CriteriaDewinAlibabaTrade FairsInstant-Quote Platforms
On-site physical audit✅ Every factory❌❌Varies
Scored audit framework✅ 50-point Dolphin❌❌Unknown
Real factory photos✅ 1,700+ photosSelf-uploadedBooth photos❌ Anonymous
Named factory profiles✅ Full profilesPartialBusiness cards❌ Anonymous
Equipment list per factory✅❌❌❌
Pre-shipment inspection✅ Every order❌❌Optional
Bilingual QC team in Vietnam✅ Full-time team❌❌❌ Platform only

Frequently Asked Questions

Access Our Audited Factory Network

Send us your RFQ and we'll match you with the right pre-qualified Vietnam factory for your process, volume, and quality requirements — usually within 24 hours.

Quick Sourcing Inquiry