Skip to main content

🇻🇳 178 profiles · Engineering review

Anh Minh factory overview
Iron CastingDEWIN On-Ground Audited

Anh Minh

ANH MINH COMPANY LIMITED

Location
Vietnam

Factory Overview

Anh Minh is a verified iron casting manufacturer in Vietnam with 52 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Iron Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

12 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: AM- Business license.pdf
Secure Download

Anh Minh Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: AM- Company profile.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: AM- Dolphin report 20250419.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: AM- ISO 9001-2015 certificate.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: AM- Business license.pdf
Secure Download

Anh Minh Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: AM- Company profile.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: AM- Dolphin report 20250419.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: AM- ISO 9001-2015 certificate.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: AM - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: AM- QCLDM Score 20250419.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: AM - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: AM- QCLDM Score 20250419.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

104 photos
AM- Company Information

AM- Company Information

Factory Overview
CNC milling machine

CNC milling machine

Production Line
Casting area

Casting area

Quality Control
Casting mold 1

Casting mold 1

Equipment
Casting mold 2

Casting mold 2

Production Line
Foundry-Master spectrometer

Foundry-Master spectrometer

Quality Control
Grinding and Polishing Machine

Grinding and Polishing Machine

Equipment
Hardness Tester

Hardness Tester

Production Line
Industrial scrap area 1

Industrial scrap area 1

Quality Control
Industrial scrap area 2

Industrial scrap area 2

Equipment
Main workshop 1

Main workshop 1

Production Line
Main workshop 2

Main workshop 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Sand CastingMachiningHeat Treatment

Equipment Logs

  • CNC milling machine
  • Grinding and Polishing Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry