Skip to main content

🇻🇳 178 profiles · Engineering review

Chau Da factory overview
CNC MachiningDEWIN On-Ground Audited

Chau Da

CHAU DA COMPANY LIMITED

Location
Vietnam

Factory Overview

Chau Da is a verified cnc machining manufacturer in Vietnam with 35 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CNC Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Business liciense.pdf

Document

Verified supplier archive file.

File: Business liciense.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Chau Da 20231031.docx
Secure Download

Chau Da Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Profile CDA 0923.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Chau Da.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Chau Da 20231031.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

35 photos
CNC Milling machine

CNC Milling machine

Factory Overview
CNC laser cutting machine

CNC laser cutting machine

Production Line
CNC lathe machine

CNC lathe machine

Quality Control
CNC milling machine (2)

CNC milling machine (2)

Equipment
CNC milling machine (3)

CNC milling machine (3)

Production Line
Product (2)

Product (2)

Quality Control
Product (3)

Product (3)

Equipment
Sample

Sample

Production Line
Stamping machine

Stamping machine

Quality Control
Tool rack (2)

Tool rack (2)

Equipment
Workshop overiew (2)

Workshop overiew (2)

Production Line
Workshop overiew (3)

Workshop overiew (3)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MillingCNC TurningPrecision Machining

Equipment Logs

  • CNC Milling machine
  • CNC laser cutting machine
  • CNC lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry