Skip to main content

🇻🇳 178 profiles · Engineering review

Chin Well - Basic Information factory overview
Chin Well (Fastener - Vn)DEWIN On-Ground Audited

Chin Well - Basic Information

Chin Well - Basic information

Location
Vietnam

Factory Overview

Chin Well - Basic Information is a verified chin well (fastener - vn) manufacturer in Vietnam with 8 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Chin Well (Fastener - Vn) components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

0 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audited Document Archive Locked

Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.

On-Site Visual Audit

High-Resolution verified shop floor logs

8 photos
Certification 1

Certification 1

Factory Overview
Environment Certification

Environment Certification

Production Line
ISO 1400-2015

ISO 1400-2015

Quality Control
ISO 9001-2015 (1)

ISO 9001-2015 (1)

Equipment
ISO 9001-2015 (2)

ISO 9001-2015 (2)

Production Line
ISO 9001-2015

ISO 9001-2015

Quality Control
ISO14001-2015

ISO14001-2015

Equipment
ISO9001-2015

ISO9001-2015

Production Line

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Chin Well (Fastener - Vn)

Equipment Logs

Machine list is attached in the Trust Vault verified XLS sheet.

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry