Skip to main content

🇻🇳 178 profiles · Engineering review

Cncps High Technoligies Joint Stock Company factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Cncps High Technoligies Joint Stock Company

CNCPS high technoligies joint stock company

Location
Vietnam

Factory Overview

Cncps High Technoligies Joint Stock Company is a verified plastic injection molding manufacturer in Vietnam with 34 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report CNCPS.docx

Document

Verified supplier archive file.

File: Audit report CNCPS.docx
Secure Download

Cncps High Technoligies Joint Stock Company Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: BUSINESS PROFILE CNCPS 2023.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: CNCPS Business License.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List CNCPS.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score CNCPS.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

34 photos
3D CMM

3D CMM

Factory Overview
CNC milling machine (2)

CNC milling machine (2)

Production Line
CNC milling machine

CNC milling machine

Quality Control
Good area

Good area

Equipment
Machine handover inspection schedule

Machine handover inspection schedule

Production Line
Mold area

Mold area

Quality Control
Office

Office

Equipment
Outside of the company (2)

Outside of the company (2)

Production Line
Outside of the company (3)

Outside of the company (3)

Quality Control
Outside of the company (4)

Outside of the company (4)

Equipment
Outside of the company

Outside of the company

Production Line
Packing area

Packing area

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

  • 3D CMM
  • CNC milling machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry