
Dai Nghiep Plastic Joint Stock Company
Dai Nghiep Plastic Joint Stock Company
Factory Overview
Dai Nghiep Plastic Joint Stock Company is a verified plastic injection molding manufacturer in Vietnam with 39 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Plastic Injection Molding components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audit report Dai Nghiep.docx
DocumentVerified supplier archive file.
File: Audit report Dai Nghiep.docxVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: Equipment List Dai Nghiep.xlsxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: QCLDM Score Dai Nghiep.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

CNC milling machine (2)

CNC milling machine (3)

CNC milling machine

Milling machine (2)

Milling machine (3)

Milling machine

Mold area (2)

Mold area

Packing area (2)

Packing area

Photo with contacted person

Product (2)
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- CNC milling machine 2
- CNC milling machine 3
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote