Skip to main content

🇻🇳 178 profiles · Engineering review

Dai Thanh Production – Trading – Service factory overview
CNC MachiningDEWIN On-Ground Audited

Dai Thanh Production – Trading – Service

DAI THANH PRODUCTION – TRADING – SERVICE COMPANY LIMITED

Location
Vietnam

Factory Overview

Dai Thanh Production – Trading – Service is a verified cnc machining manufacturer in Vietnam with 30 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CNC Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Dai Thanh Production – Trading – Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: DTC_BROCHURE2.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Dai Thanh 20231013.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Dai Thanh.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Dai Thanh.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Dai Thanh revised 20231011.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Dai Thanh.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

30 photos
2D VMM

2D VMM

Factory Overview
3D CMM

3D CMM

Production Line
CNC lathe machine

CNC lathe machine

Quality Control
Gauge

Gauge

Equipment
Goods inspection area

Goods inspection area

Production Line
Laser cutting machine

Laser cutting machine

Quality Control
Mold area

Mold area

Equipment
Office area

Office area

Production Line
Outside of the company (2)

Outside of the company (2)

Quality Control
Packing Area (2)

Packing Area (2)

Equipment
Packing area

Packing area

Production Line
Photo with contacted person (2)

Photo with contacted person (2)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MillingCNC TurningPrecision Machining

Equipment Logs

  • 3D CMM
  • CNC lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry