
Dysm Alumium Die-Casting Co.,Ltd
DYSM Alumium die-casting co.,ltd
Factory Overview
Dysm Alumium Die-Casting Co.,Ltd is a verified aluminum die-casting manufacturer in Vietnam with 42 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Aluminum Die-Casting components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audit report DYSM_2023.docx
DocumentVerified supplier archive file.
File: Audit report DYSM_2023.docxVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: Equipment DYSM_2023.xlsxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: QCLDM Score DYSM_2023.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

Control panel

Department name plate

Dial indicator

Die casting machine 2

Die casting machine 3

Die casting machine 4

Die casting machine 5

Die casting machine 6

Die casting machine 7

Die casting machine 8

Die casting machine 9

Die casting mold 2
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- Die casting machine 2
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote