Skip to main content

🇻🇳 178 profiles · Engineering review

Eskimos Trading Production Joint Stock Company factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Eskimos Trading Production Joint Stock Company

Eskimos trading production joint stock company

Location
Vietnam

Factory Overview

Eskimos Trading Production Joint Stock Company is a verified plastic injection molding manufacturer in Vietnam with 4 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

3 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report Eskimos.docx

Document

Verified supplier archive file.

File: Audit report Eskimos.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Eskimos.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

4 photos
Warehouse (2)

Warehouse (2)

Factory Overview
Warehouse (3)

Warehouse (3)

Production Line
Warehouse

Warehouse

Quality Control
stock card

stock card

Equipment

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

Machine list is attached in the Trust Vault verified XLS sheet.

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry