
Essence - Photo
Essence - Photo
Factory Overview
Essence - Photo is a verified essence (fastener vietnam) manufacturer in Vietnam with 48 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Essence (Fastener Vietnam) components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audited Document Archive Locked
Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.
Dolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

Slit Cutting+Washer Assembly:

Auto feeding lathe

Automatic cleaning line

Camera Shots per set

Certification (1)

Certification 1

Certification 2

Certification

Cleaning Are

Cold forming

Continuous mesh belt heat treatment line (1)

Continuous mesh belt heat treatment line
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- Auto feeding lathe
- Multi-Die Cold Forming Machine 1
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote