
Global Mechanical Construction Production
GLOBAL MECHANICAL CONSTRUCTION PRODUCTION COMPANY LIMITED
Factory Overview
Global Mechanical Construction Production is a verified sheet metal manufacturer in Vietnam with 37 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Sheet Metal components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
GLM - Company information.pdf
DocumentVerified supplier archive file.
File: GLM - Company information.pdfDEWIN Dolphin Audit Report
Dolphin AuditProprietary 50-point factory audit covering capacity, worker compliance, and safety standards.
File: GLM - Dolphin report 20250505.docxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: GLM - QCLDM Score 20250505.xlsxVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: GLM - List of equipment.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

Bending machine 1

Bending machine 2

Flattening machine

Grinding machine

Hand tube bending machine

Lathe machine 2

Lathe machine

Metal forming machine 1

Metal forming machine 2

Metal shearing machine

Milling machine

Multi-spot welding machine
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- Bending machine 1
- Bending machine 2
- Lathe machine 2
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote