Skip to main content

🇻🇳 178 profiles · Engineering review

Gravity Casting Pro factory overview
Precision CastingDEWIN On-Ground Audited

Gravity Casting Pro

GRAVITY CASTING PRO JOINT STOCK COMPANY

Location
Vietnam

Factory Overview

Gravity Casting Pro is a verified precision casting manufacturer in Vietnam with 50 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Precision Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

4 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Gravity Casting Pro Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: GR- Profile company.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: GR- Dolphin report 20250814.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: GR - QCLDM Score 20250814.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: GR- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

50 photos
GR- Certificate of ISO 9001-2015

GR- Certificate of ISO 9001-2015

Factory Overview
5S Board

5S Board

Production Line
Aluminum Casting Blank

Aluminum Casting Blank

Quality Control
Automatic Shot Blasting Machine

Automatic Shot Blasting Machine

Equipment
Certificate of factory

Certificate of factory

Production Line
Cold Chamber Die Casting Machine 1

Cold Chamber Die Casting Machine 1

Quality Control
Cold Chamber Die Casting Machine 2

Cold Chamber Die Casting Machine 2

Equipment
Coordinate Measuring Machine

Coordinate Measuring Machine

Production Line
Die Casting Molds

Die Casting Molds

Quality Control
Firefighting Regulations

Firefighting Regulations

Equipment
Hardness testing notice

Hardness testing notice

Production Line
Heat Treatment Report

Heat Treatment Report

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Lost Wax CastingDie CastingCNC Finishing

Equipment Logs

  • Automatic Shot Blasting Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry