
Hirata Precision Industrial Vn
Hirata precision industrial VN
Factory Overview
Hirata Precision Industrial Vn is a verified plastic injection molding manufacturer in Vietnam with 83 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Plastic Injection Molding components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audit report Hirata.docx
DocumentVerified supplier archive file.
File: Audit report Hirata.docxHirata Precision Industrial Vn Factory Catalog
ProfileOfficial manufacturer profile, dimensional product catalogs, and surface finish options.
File: HPV PROFILE 2023.pdfVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: Equipment List Hirata.xlsxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: QCLDM ScoreHirata.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

2D VMM (2)

2D VMM

5S criteria

6S activity board

Bavia processing waiting area

Documentation

Information Board

Inspection Area (2)

Inspection room

Machine inspection records

Meeting room

Mold usage instructions
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- Machine inspection records
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote