Skip to main content

🇻🇳 178 profiles · Engineering review

Hoang Gia Garment Company Limited factory overview
GarmentDEWIN On-Ground Audited

Hoang Gia Garment Company Limited

Hoang Gia Garment Company Limited

Location
Vietnam

Factory Overview

Hoang Gia Garment Company Limited is a verified garment manufacturer in Vietnam with 30 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Garment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

3 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Hoang Gia Garment Company Limited.docx

Document

Verified supplier archive file.

File: Hoang Gia Garment Company Limited.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Hoang Gia.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Hoang Gia.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

30 photos
Company sign

Company sign

Factory Overview
Detailed order

Detailed order

Production Line
Industrial sewing machine

Industrial sewing machine

Quality Control
Office

Office

Equipment
Outside of the company

Outside of the company

Production Line
Photo with contacted person

Photo with contacted person

Quality Control
Product (2)

Product (2)

Equipment
Product (4)

Product (4)

Production Line
Product

Product

Quality Control
Raw materials (2)

Raw materials (2)

Equipment
Raw materials (3)

Raw materials (3)

Production Line
Raw materials (4)

Raw materials (4)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Garment

Equipment Logs

  • Industrial sewing machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry