Skip to main content

🇻🇳 178 profiles · Engineering review

Hoang Thinh Mechanical Production factory overview
Gym EquipmentDEWIN On-Ground Audited

Hoang Thinh Mechanical Production

HOANG THINH MECHANICAL PRODUCTION COMPANY LIMITED

Location
Vietnam

Factory Overview

Hoang Thinh Mechanical Production is a verified gym equipment manufacturer in Vietnam with 43 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Gym Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

3 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HT - Dolphin report 20250731.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HT- QCLDM Score 20250731.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HT- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

43 photos
Bench Drill Press

Bench Drill Press

Factory Overview
Compressed gas cylinder

Compressed gas cylinder

Production Line
Drill Press machine 1

Drill Press machine 1

Quality Control
Drill Press machine 2

Drill Press machine 2

Equipment
Fixture

Fixture

Production Line
Heat Treatment Furnace

Heat Treatment Furnace

Quality Control
Horizontal Band Saw

Horizontal Band Saw

Equipment
Horizontal Milling Machine

Horizontal Milling Machine

Production Line
Hydraulic Press Brake

Hydraulic Press Brake

Quality Control
Lathe machine

Lathe machine

Equipment
Main workshop 1

Main workshop 1

Production Line
Main workshop 2

Main workshop 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Gym Equipment

Equipment Logs

  • Bench Drill Press
  • Drill Press machine 1
  • Lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry