Skip to main content

🇻🇳 178 profiles · Engineering review

Huong Binh Phat factory overview
Gym EquipmentDEWIN On-Ground Audited

Huong Binh Phat

HUONG BINH PHAT COMPANY LIMITED

Location
Vietnam

Factory Overview

Huong Binh Phat is a verified gym equipment manufacturer in Vietnam with 35 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Gym Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: BP- Business license.pdf
Secure Download

BP- Certificate BS-EN 124-2015.pdf

Document

Verified supplier archive file.

File: BP- Certificate BS-EN 124-2015.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: BP- Certificate ISO 9001-2015.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: BP - Dolphin report 20250801.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: BP - QCLDM Score 20250801.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: BP- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

35 photos
Casting Mold 1

Casting Mold 1

Factory Overview
Casting Mold 2

Casting Mold 2

Production Line
Casting Mold 3

Casting Mold 3

Quality Control
Casting Mold 4

Casting Mold 4

Equipment
Drilling machine 1

Drilling machine 1

Production Line
Drilling machine 2

Drilling machine 2

Quality Control
Foundry area 1

Foundry area 1

Equipment
Foundry area 2

Foundry area 2

Production Line
Foundry molds

Foundry molds

Quality Control
Heat Treatment Furnace

Heat Treatment Furnace

Equipment
Main workshop 1

Main workshop 1

Production Line
Main workshop 2

Main workshop 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Gym Equipment

Equipment Logs

  • Drilling machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry