Skip to main content

🇻🇳 178 profiles · Engineering review

Huynh Duc Production Trading Services factory overview
CNC MachiningDEWIN On-Ground Audited

Huynh Duc Production Trading Services

HUYNH DUC PRODUCTION TRADING SERVICES COMPANY LIMITED

Location
Vietnam

Factory Overview

Huynh Duc Production Trading Services is a verified cnc machining manufacturer in Vietnam with 98 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CNC Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

10 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Huynh Duc Production Trading Services Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: HDP - Brochure.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HDP - Dolphin report 20241017.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: HDP - ISO 90012015 certificate.pdf
Secure Download

Huynh Duc Production Trading Services Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: HDP - Brochure.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HDP - Dolphin report 20241017.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: HDP - ISO 90012015 certificate.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HDP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HDP - QCLDM Score 20241017.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HDP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HDP - QCLDM Score 20241203.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

177 photos
Bending machine

Bending machine

Factory Overview
CMM 3D

CMM 3D

Production Line
CNC milling machine 1

CNC milling machine 1

Quality Control
CNC milling machine 2

CNC milling machine 2

Equipment
CNC milling machine 3

CNC milling machine 3

Production Line
Electric discharge machine

Electric discharge machine

Quality Control
GO-NO GO gauge

GO-NO GO gauge

Equipment
Grinding machine

Grinding machine

Production Line
Hardness testing and height gauge

Hardness testing and height gauge

Quality Control
Inspection equipment

Inspection equipment

Equipment
Laser cutting machine

Laser cutting machine

Production Line
Office area

Office area

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MillingCNC TurningPrecision Machining

Equipment Logs

  • Bending machine
  • CMM 3D
  • CNC milling machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry