Skip to main content

🇻🇳 178 profiles · Engineering review

Katsura Vn factory overview
Aluminum Die-CastingDEWIN On-Ground Audited

Katsura Vn

Katsura VN JSC

Location
Vietnam

Factory Overview

Katsura Vn is a verified aluminum die-casting manufacturer in Vietnam with 43 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Aluminum Die-Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

7 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: Business license.pdf
Secure Download

Katsura Vn Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Catalogue Katsura.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Katsura 20231031.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: KATSURA -ISO 9001-2015.pdf
Secure Download

Katsura Vn Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Profile Katsura.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment Katsura 20231023.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Katsura 20231031.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

43 photos
2D VMM

2D VMM

Factory Overview
3D CMM

3D CMM

Production Line
Bandsaw Machine

Bandsaw Machine

Quality Control
Bending mechine

Bending mechine

Equipment
Boring process

Boring process

Production Line
Company sign

Company sign

Quality Control
Die casting machine 1

Die casting machine 1

Equipment
Die casting machine 3

Die casting machine 3

Production Line
Die casting machine 5

Die casting machine 5

Quality Control
Die casting machine 7

Die casting machine 7

Equipment
Drilling machine

Drilling machine

Production Line
Mold maintenance area

Mold maintenance area

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Die CastingCNC MachiningSurface Treatment

Equipment Logs

  • Bandsaw Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry