
Mfc Trading Manufacture Joint Stock Company
MFC Trading Manufacture Joint Stock Company
Factory Overview
Mfc Trading Manufacture Joint Stock Company is a verified cnc machining manufacturer in Vietnam with 17 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
CNC Machining components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audit report MFC.docx
DocumentVerified supplier archive file.
File: Audit report MFC.docxVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: CNCTech-Binh-Duong-Equipment-List_v21.04.pdfMfc Trading Manufacture Joint Stock Company Factory Catalog
ProfileOfficial manufacturer profile, dimensional product catalogs, and surface finish options.
File: CNCTech-Manufacturing-Brochure_v2303.pdfGPKD CNCBD - Lần 7.pdf
DocumentVerified supplier archive file.
File: GPKD CNCBD - Lần 7.pdfcertificate 9001-2015.pdf
DocumentVerified supplier archive file.
File: certificate 9001-2015.pdfQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: QCLDM Score MFC.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

3D CMM

CNC Milling machine

CNC milling Machine (2)

Hardness tester and CMM

Outside of the company

Photo with contacted person

Product

Sample

Warehouse

Workshop overiew (2)

Workshop overiew (3)

Workshop overiew (4)
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- 3D CMM
- CNC Milling machine
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote