Skip to main content

🇻🇳 178 profiles · Engineering review

Mien Nam Product Development Investment factory overview
Furniture ManufacturingDEWIN On-Ground Audited

Mien Nam Product Development Investment

Mien Nam Product Development Investment JSC

Location
Vietnam

Factory Overview

Mien Nam Product Development Investment is a verified furniture manufacturing manufacturer in Vietnam with 48 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Business licence.pdf

Document

Verified supplier archive file.

File: Business licence.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Mien Nam JSC.docx
Secure Download

Mien Nam Product Development Investment Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: catalogue-noi-that-hoa-phat.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Mien Nam JSC.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Mien Nam JSC updated 20231012.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Mien Nam JSC.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

48 photos
6 function edge banding machine

6 function edge banding machine

Factory Overview
Edge banding machine

Edge banding machine

Production Line
Powder coating line (2)

Powder coating line (2)

Quality Control
Powder coating line

Powder coating line

Equipment
Smooth planer

Smooth planer

Production Line
Steel tube cutting machine

Steel tube cutting machine

Quality Control
company sign

company sign

Equipment
conveyor belt

conveyor belt

Production Line
lathe machine

lathe machine

Quality Control
maintenance

maintenance

Equipment
outside of the company (2)

outside of the company (2)

Production Line
outside of the company

outside of the company

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • 6 function edge banding machine
  • Edge banding machine
  • lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry