
Ming Chuan Electronic Technology Vietnam
MING CHUAN ELECTRONIC TECHNOLOGY VIETNAM COMPANY LIMITED
Factory Overview
Ming Chuan Electronic Technology Vietnam is a verified outdoor power equipment manufacturer in Vietnam with 194 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Outdoor Power Equipment components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Government Business Registration
LegalOfficial Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.
File: MC - Business license.pdfDEWIN Dolphin Audit Report
Dolphin AuditProprietary 50-point factory audit covering capacity, worker compliance, and safety standards.
File: MC - Dolphin report 20250827.docxISO 9001:2015 Certification
CertificationCertified Quality Management System (QMS) standard for international trade compliance.
File: MC - ISO 90012015 certificate.pdfMC - Factory introduction video 20250919(1).xlsx
DocumentVerified supplier archive file.
File: MC - Factory introduction video 20250919(1).xlsxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: MC - QCLDM Score 20250827.xlsxVerified Machine & Capacity List
Equipment LogComplete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.
File: MC - List of equipment.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

MC - Company information

5S ISO standard-compliant finished goods warehouse

Barcode label showing item code, quantity, and stock location

Color Comparison Machine Operation Instruction

Color Inspection Machine Checklist

Color comparison machine

Colorimeter

Company Quality Objectives

Company Quality Policy

Company reception with front desk and waiting area

Compliance with ISO procedures

Consolidation area before dispatch to transport team
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- Color Comparison Machine Operation Instruction
- Conveyor Belt for Transferring Products After Injection Molding Machine
- Lathe machine
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote