Skip to main content

🇻🇳 178 profiles · Engineering review

Minh Phat Huy Co. Ltd factory overview
Plastic & RubberDEWIN On-Ground Audited

Minh Phat Huy Co. Ltd

MINH PHAT HUY CO. LTD

Location
Vietnam

Factory Overview

Minh Phat Huy Co. Ltd is a verified plastic & rubber manufacturer in Vietnam with 46 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic & Rubber components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: MPH - Branch business license.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: MPH - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MPH - Dolphin report 20240802.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MPH - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MPH - QCLDM Score 20241203.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

46 photos
1000mm Digital Caliper

1000mm Digital Caliper

Factory Overview
Bending machine

Bending machine

Production Line
Caliper use in production

Caliper use in production

Quality Control
Group photo with sales person contacted

Group photo with sales person contacted

Equipment
Identified card on products

Identified card on products

Production Line
Maintenance rules

Maintenance rules

Quality Control
Mixing system

Mixing system

Equipment
Mold

Mold

Production Line
NG product

NG product

Quality Control
Outerview of gate

Outerview of gate

Equipment
Package area 1

Package area 1

Production Line
Package area 2

Package area 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingRubber MoldingAssembly

Equipment Logs

  • Bending machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry