Skip to main content

🇻🇳 178 profiles · Engineering review

Minh Quang Mechanical Manufacturing factory overview
Precision CastingDEWIN On-Ground Audited

Minh Quang Mechanical Manufacturing

MINH QUANG MECHANICAL MANUFACTURING CO., LTD

Location
Vietnam

Factory Overview

Minh Quang Mechanical Manufacturing is a verified precision casting manufacturer in Vietnam with 90 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Precision Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

7 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: MQ- Business license.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: MQ- Certificate ISO 9001-2015.pdf
Secure Download

Minh Quang Mechanical Manufacturing Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MQ- Profile company.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MQ- Dolphin report 20250919.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: MQ- Certificate ISO 9001-2015.pdf
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MQ- QCLDM Score 20250919.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MQ- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

90 photos
5S Board

5S Board

Factory Overview
Aluminum die casting machine 1

Aluminum die casting machine 1

Production Line
Aluminum die casting machine 2

Aluminum die casting machine 2

Quality Control
Automatic Tapping Machine

Automatic Tapping Machine

Equipment
Belt Grinder Machine

Belt Grinder Machine

Production Line
Bench Drill machine

Bench Drill machine

Quality Control
CNC Lathe machine

CNC Lathe machine

Equipment
CNC Milling Machine

CNC Milling Machine

Production Line
Cut-off saw machine

Cut-off saw machine

Quality Control
Digital Height Gauge

Digital Height Gauge

Equipment
Injection Molding Machine 1

Injection Molding Machine 1

Production Line
Injection Molding Machine 2

Injection Molding Machine 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Lost Wax CastingDie CastingCNC Finishing

Equipment Logs

  • Aluminum die casting machine 1
  • Aluminum die casting machine 2
  • Automatic Tapping Machine
  • CNC Lathe machine
  • Injection Molding Machine 1
  • Multi-spindle Automatic Lathe

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry